Similar Projects
Hargrove Road and Mcfarland Boulevard Right Turn Lanes Road Improvement Project
Post-Bid
Less than $3,086,990 est. value
Tuscaloosa, AL

District 4 Water/Sewer Improvements (Fleming Road Drainage Improvements)
Post-Bid
$700,000 to $750,000 est. value
Montgomery, AL

Constructing the Resurfacing and Traffic Stripe on CR-85 from The Junction of SR-41 To The Junction of CR-12. Length5.986 Mi.
Results
$986,657 to $1,205,914 est. value
AL

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-155 from the Chilton County Line to the junction of SR-25 in Montevallo. Length 2.214 Mi.
Results
$2,233,609 to $2,729,966 est. value
AL

Daphne Innovations and Science Complex
Construction
Less than $3,000,000 est. value
Daphne, AL

Baypointe Hospital Repaving
Renovation - 63,700 SF
Post-Bid
$375,000 est. value
Mobile, AL 36693

Bituminous Surface Treatments on Various County Roads
Results
AL

Constructing the Planing, Resurfacing, and Traffic Stripe on CR-24 (Cloverfield/Federal Road) from the Lowndes County Line to the Intersection of SR-3 (Us-31). Length 2.955 Mi
Post-Bid
$525,346 to $642,089 est. value
AL

Cecil Ashburn Drive Widening
Results
Huntsville, AL

Corrugated Steel Pipe
Term Contract
Post-Bid
Huntsville, AL

US Highway 231 Scenic Overlook
Results
$480,000 to $550,000 est. value
Oneonta, AL

Miscellaneous Package C Campus Paving
Post-Bid
Less than $200,000 est. value
Hanceville, AL

Bituminous Concrete Asphalt (Plantmix)
Results
Anniston, AL

Southern Region Disaster Recovery Support BPA
Post-Bid

Asphalt Resurfacing 2018
Results
Evergreen, AL

Last Updated 06/03/2019 02:24 AM
Project Title

Constructing the Culvert Replacement, Widening, Resurfacing, and Traffic Stripe

Physical Address View project details and contacts
City, State (County) AL   (Morgan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $812,920 to $993,569
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Constructing the Culvert Replacement, Widening, Resurfacing, and Traffic Stripe on Union Hill Road From the Intersection of Apple Grove Road to the Junction of SR-53 (US-231) East of Union Hill. 201a002 Clearing And Grubbing (Maximum Allowable Bid $ 4,000.00 Per Acre) (Approximately 1 Acre) (1) Ls 206b000 Removal Of Old Box Culvert, Station 20+25.00 (1) Ls 206c010 Removing Concrete Driveway 21 Sqyd 210a000 Unclassified Excavation 52 Cuyd 210d001 Borrow Excavation (Loose Truckbed Measurement) 345 Cuyd 214a000 Structure Excavation 169 Cuyd 214b001 Foundation Backfill, Commercial 59 Cuyd 301a012 Crushed Aggregate Base Course, Type b, Plant Mixed, 6" Compacted Thickness 135 Sqyd 327d021 Plant Mix Bituminous Base, Widening, Mix 2 1,007 Ton 401a000 Bituminous Treatment a 106 Sqyd 401b100 Bituminous Treatment e (With Polymer Additive) 43,960 Sqyd 405a000 Tack Coat 1,319 Gal 407b000 Joint Sealant For Hot Mix Asphalt Pavement 4 Mile 410h000 Material Remixing Device 1 Each 424a360 Superpave Bituminous Concrete Wearing Surface Layer, 1/2" Maximum Aggregate Size Mix, Esal Range c/d 3,767 Ton 424b650 Superpave Bituminous Concrete Upper Binder Layer, 3/4" Maximum Aggregate Size Mix, Esal Range c/d 13 Ton 424b654 Superpave Bituminous Concrete Upper Binder Layer, Patching, 3/4" Maximum Aggregate Size Mix, Esal Range c/d 50 Ton 424b658 Superpave Bituminous Concrete Upper Binder Layer, Leveling, 3/4" Maximum Aggregate Size Mix, Esal Range c/d 50 Ton 430b043 Aggregate Surfacing (1" Down, Crusher Run) 2,367 Ton 502a000 Steel Reinforcement 15,407 Lb 524a010 Culvert Concrete 100 Cuyd 600a000 Mobilization (1) Ls 650a000 Topsoil 100 Cuyd 652a100 Seeding 1 Acre 656a010 Mulching 1 Acre 665j002 Silt Fence 100 Lf 665o001 Silt Fence Removal 100 Lf 680a001 Geometric Controls (1) Ls 698a000 Construction Fuel (Maximum Bid Limited To $ 46,000.00) (1) Ls 701a231 Solid White, Class 2, Type a Traffic Stripe 7 Mile 701a235 Solid Yellow, Class 2, Type a Traffic Stripe 6 Mile 701a245 Broken Yellow, Class 2, Type a Traffic Stripe 1 Mile 701c000 Broken Temporary Traffic Stripe 1 Mile 701c001 Solid Temporary Traffic Stripe 12 Mile 703a002 Traffic Control Markings, Class 2, Type a 238 Sqft 705a032 Pavement Markers, Class a-h, Type 1-b 33 Each 705a037 Pavement Markers, Class a-h, Type 2-d 373 Each 740b000 Construction Signs 398 Sqft 740f002 Barricades, Type Iii 10 Each 740i002 Warning Lights, Type b 5 Each 740o000 Pilot Car 1 Each
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 08 - Openings, Traffic Doors, Flexible Strip Doors.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents