Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

Replace Bldg 215 DDC Hines It Center (HITC)
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Hines, IL 60141

Bone Marrow Fan Replacement - Divisions 03, 04, 05
Alteration
Bidding
$100,000 est. value
Chicago, IL 60612

Harper College - Building Z Refrigerant Detection
Post-Bid
Palatine, IL 60067

OA Dampers at Bridge ES
Post-Bid
Chicago, IL 60634

Geothermal Leak Repair - Goode High School
Results
Chicago, IL 60652

OA Dampers Bridge ES
Results
Chicago, IL 60634

Bone Marrow Fan Replacement - Division 01 - General Work
Alteration
Bidding
$200,000 est. value
Chicago, IL 60612

HVAC and Mechanical Products
Term Contract
Post-Bid

Annual HVAC Maintenance Contract
Term Contract
Results
Lincolnwood, IL

HVAC Full-Service Preventative Maintenance
Alteration
Bidding
Country Club Hills, IL

CTE Mechanical Equipment at Prospect HS
Post-Bid
Mount Prospect, IL 60056

Dirksen Ventilator and Condensing Unit
Results
Chicago, IL 60656

Replace Building 215 DDC Hines IT Center (HITC) - Hines
Renovation, Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Hines, IL 60141

Robert Crown Center HVAC Maintenance
Post-Bid
Evanston, IL 60202

Last Updated 06/02/2022 05:57 AM
Project Title

Roof Top Unit Replacement

Physical Address View project details and contacts
City, State (County) Arlington Heights, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish labor to remove the existing privacy fence around the existing RTU’s. Disconnect the existing RTU’s piping and power wiring. Remove the existing refrigerant per EPA Guidelines. Provide the services of a crane to remove the two (2) existing Lennox RTU’s. Provide the services of a crane to furnish and install two (2) new Energy Code Compliant Lennox KGB180S4MM 15 TON RTU’S. Furnish and install two (2) new actuators and make the necessary wiring changes for communication purposes to the existing Delta BAS system. Modify and install new electrical and gas connections as needed. Furnish labor to re-install the existing privacy fence back up around the new RTU’s. Includes all computer programming and any other necessary Delta communication needs for a turn-key operation. Perform start-up and verify proper operation of the two (2) new Lennox RTU’s

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents