Similar Projects
Walnut Area Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$1,000,000 CJ est. value
Gadsden, AL 35901

Walnut Area Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$1,000,000 CJ est. value
Gadsden, AL 35901

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Walnut Grove Senior Center
New Construction - 2,800 SF
Post-Bid
Walnut Grove, AL 35990

Contract No.3 - Installation of Water Main
Infrastructure
Results
Southside, AL

I-59 Crossing and Pineview Main Replacement
Infrastructure
Results
$183,000 est. value
Attalla, AL

2022 Sanitary Sewer Rehabilitation Project
Infrastructure
Post-Bid
$280,000 CJ est. value
Attalla, AL 35952

2022 CDBG Water System Improvements Rebid
Infrastructure
Results
$641,000 CJ est. value
Altoona, AL 35952

Farmers Market Building - Rebid
New Construction, Infrastructure - 1,152 SF
Post-Bid
$45,000 CJ est. value
Attalla, AL 35954

AMR Water Meter Project - Material
Infrastructure
Results
$137,047 CJ est. value
Walnut Grove, AL 35952

Saferoom #2 Project
New Construction, Infrastructure
Post-Bid
Attalla, AL 35952

Surface Treatment (Micro-Surfacing Seal Coat, Type II and III) and Traffic Stripe on SR-74 (US-278)
Infrastructure
Results
$648,165 CJ est. value
Snead, AL 35952

1905.3 Contract 3 - Water System Improvements for Big Wills Water Authority
Infrastructure
Post-Bid
$3,075,250 CJ est. value
Attalla, AL 35952

Roadway Improvements (Left Turn Lane Addition) on SR-75
Infrastructure
Results
$521,748 CJ est. value
Susan Moore, AL 35952

Noccalula Falls Gorge Trail Pedestrian Access Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Gadsden, AL 35904

Last Updated 07/03/2023 09:40 AM
Project Title

Cleveland Avenue Booster Pump Station Upgrade

Physical Address View project details and contacts
City, State (County) Attalla, AL 35952   (Etowah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $543,914 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Demolition of existing pumps and piping, installation of two new water booster pumps, above grade piping and valves, control panel, new electrical service, HVAC, natural gas generator, masonry, painting, replacement of master meter and piping in meter pit, and related items.Owner requires the Project to be completed in 180 calendar days. E. Potential bidders may view the Bid Documents at the office of Canyon Engineering by appointment only. F. Bidders will be required to provide Bid security according to the requirements in Document 002113 - Instructions to Bidders and Document 003100 - Available Project Information. G. Refer to other Bidding requirements as described in Document 002113 - Instructions to Bidders and Document 003100 - Available Project Information. H. Submit your Bid on the Bid Form provided. Bidders are required to submit the bid form, bid bond, and the E-Verify documents at the time of the bid. Bids must be submitted in a sealed envelope bearing the name and address of the bidder, the bidder's General Contractor's license number, the project name, and bid date. Bidders are asked not to submit the full contract documents and specifications book at the time of the bid. I. Bidders must carry the Municipal and Utility construction classification as listed in the roster of the Alabama State Licensing Board for General Contractors to be considered for the award of the project. J. Your Bid will be required to be submitted under a condition of irrevocability for a period of 60 calendar days after submission. K. Owner reserves the right to waive irregularities and to accept or reject any or all Bids. L. This project is funded through the Drinking Water State Revolving Fund. Direct questions in writing to Chuck Chitwood, at the office of Engineer, chuck@canyonengineeringllc.com.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents