Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Emergency Generator
Post-Bid
Colorado Springs, CO

Airport Carport Solar Project
Post-Bid
Colorado Springs, CO 80947

UPS Battery Replacement and Installation
Results
Fort Carson, CO 80913

Transformer (750KVA) Pad Mount Replacement and Installation
Results
Colorado Springs, CO 80914

Weatherization Materials - Energy Resource Center
Term Contract, Alteration
Construction
Colorado Springs, CO 80903

On-Call Emergency Generator Service
Alteration
Post-Bid
Colorado Springs, CO 80910

Electric Emergency Response / Reconstruction Services
Results
Colorado Springs, CO 80947

Switches and Uninterruptable Power Supply
Alteration
Post-Bid
Colorado Springs, CO

SECC Switchgear Replacement
Results
Colorado Springs, CO 80907

CMSFS Refurbish Diesel Generators
Term Contract
Post-Bid
Colorado Springs, CO 80906

Integrated Resource Plan (Irp) Drake 115Kv Transmission Line Design/Build (D/B)
Results
CO

61--Battery Replacements
Term Contract
Post-Bid
Fort Carson, CO

Construction Manager/ General Contractor for Electrical Sub Portfolio Packages
Results
Colorado Springs, CO 80920

LED Retrofit at Harrison School District 2
Results
$150,000 to $220,000 est. value
Colorado Springs, CO

Reported 03/18/2022 12:00 AM
Project Title

Municipal Court Generator Replacement

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

To upgrade existing generator The existing generator is over twenty-five years old and requires enhancements and an upgrade to a new natural gas stand-by generator to accommodate the existing backed up loads along with some additional loads. Demolition of the existing roof mounted generator, generator control panels, transfer switch, and emergency power panel. They also developed specifications for procurement of a new natural gas generator and new generator panels, foundation drawings, one-line updates, panel schedule updates, and plan drawings indicating the installation of the new generator, masonry wall, and associated equipment. A Cummins 80 kW Natural Gas Generator; model GGHC-4478253 to be installed at Municipal Court building

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents