Similar Projects
Schell Memorial Bridge - City of Northfield
Demolition, New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Northfield, MA 01360

Schell Memorial Bridge - City of Northfield
Demolition, New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Northfield, MA 01360

Northfield Emergency Services Facility project - GC
New Construction, Infrastructure - 17,500 SF
Bidding
$11,600,000 CJ est. value
Northfield, MA 01360

Grading and Graveling of Access Roads to the Leyden Wildlife Management Area
Infrastructure
Bidding
$20,000 CJ est. value
Leyden, MA 01301

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Fire Station Expansion / Bernardston
Addition, Demolition, Renovation, Infrastructure - 4,500 SF
Post-Bid
$4,200,000 CJ est. value
Bernardston, MA 01337

Drilling IDIQ In Massachusetts and Rhode Island
Results

Roadway Reconstruction and Related Work on Sections of Conway, South and Summer Streets and Conway Road
Infrastructure
Results
$7,780,832 est. value
Buckland, MA 01370

Franklin County Fairgrounds Slope Stabilization and Wetlands Restoration - City of Greenfield
Infrastructure
Pending Verification
$300,000 CJ est. value
Greenfield, MA 01301

NUPRO Headquarters / Deerfield
New Construction, Infrastructure - 124,680 SF
Pending Verification
$13,500,000 CJ est. value
S Deerfield, MA 01373

Highway Line Painting - Low VOC
Infrastructure
Bidding
Greenfield, MA 01301

Sweeping Streets and Parking Lots, Various Locations
Term Contract
Post-Bid
Greenfield, MA

Shutesbury Fire Station Parking Lot Paving
Infrastructure
Results
$25,000 est. value
Shutesbury, MA

H-11A Road Crack Sealing
Infrastructure
Bidding
$60,000 CJ est. value
Greenfield, MA 01301

Statewide Pavement Maintenance at General Aviation Airports in the Commonwealth Including Crack Sealing, Crack Repair, Pavement Repair
Infrastructure
Post-Bid
$3,500,000 est. value

Last Updated 04/11/2023 12:44 PM
Project Title

Baptist Corner Road Culvert Replacement

Physical Address View project details and contacts
City, State (County) Ashfield, MA 01330   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $700,150 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. No prebid meeting. Prev Wage Required. Prequal Category for MassDOT is Bridge Culvert. Project is partially funded by MVP Grant and must be completed by Sept 30, 2022. Project is being bid by Franklin Regional Council of Governments on behalf of the Town Description: The Town of Ashfield Highway Department proposes to replace an undersized culvert at the Baptist Corner Road crossing of an unnamed tributary to the Bear River. This culvert requires replacement due to deteriorating structural integrity and insufficient flow capacity. The existing culvert causes scour, impacts stream passage and creates a barrier to both aquatic and terrestrial wildlife passage. The proposed replacement of the culvert will greatly enhance wildlife passage, habitat connectivity and will fully meet the Massachusetts Stream Crossing Standards. The stream crossing upgrade will improve flows hydraulically (providing a 1.2 times bankful width span), increase flood storage, improve water quality, and restore the natural stream flow, enhancing wildlife habitat and flood protection functions. The natural substrate will be a mix of finer natural streambed materials, rounded cobbles and large boulders excavated from the historical original stream bed and augmented with outside supplied material designed to match existing stream conditions. Streambed materials will be set on top of a material base of larger stone to provide scour prevention. The proposed replacement culvert is a 19' by 4' precast three-sided structure set on inverted T precast stem walls/foundations with prefabricated segmental precast concrete wingwalls. There is no Prebid meeting for this project. Bidders may visit the site or send written questions which will be answered in consultation between the Engineer, Highway Superintendent and FRCOG .

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents