Similar Projects
Cottages At Riverlights
New Construction - 250,668 SF
Design
$10,000,000 CJ est. value
Wilmington, NC

Cargo 7 - Field Maintenance and Airside Operations
Post-Bid
Charlotte, NC

Annual Request for Qualifications for future airport-related planning and development projects
Term Contract
Post-Bid

Construct General Aviation/Fixed Base Operation Services and Facilities
- 23,200 SF
Results
Wilmington, NC

Concourse E Expansion Phase 9
Results
Charlotte, NC

New Terminal Building
New Construction
Construction
Aulander, NC 27805

Fayetteville Regional Airport Airline Terminal Improvements Part 2 Project
Construction
Less than $27,584,245 est. value
Fayetteville, NC 28306

Terminal Modernization Project
Renovation, Addition - 275,000 SF
Post-Bid
$150,000,000 to $200,000,000 est. value
Fletcher, NC 28732

Runway 20 Glideslope Replacement
Results
$458,140 est. value
Salisbury, NC

Terminal Improvements Contract 3
Construction
Less than $40,000,000 est. value
Wilmington, NC 28401

DNC Renovations Durham Station
Renovation
Post-Bid
Durham, NC 27701

ADA Renovation Galyon Transportation Center
Renovation - 4,873 SF
Construction
$1,057,000 est. value
Greensboro, NC 27401

Wilson Station ADA Renovation
Renovation
Post-Bid
Wilson, NC 27893

Passenger Boarding Bridge Maintenance Services
Post-Bid
Charlotte, NC

Federal Inspection Station and Concourse D Renovations
Renovation
Post-Bid
Charlotte, NC

Last Updated 08/19/2020 12:00 PM
Project Title

Jacksonville Station

Physical Address View project details and contacts
City, State (County) Jacksonville, NC   (Onslow County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method
Project Status Construction Commenced July 2020
Bids Due View project details and contacts
Estimated Value $8,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a new bus transit facility with an approximately 15,000 square foot transit/administration building and associated bus unloading/loading area.

Details

1 Airline/Passenger Terminal, 15,000 SF New Construction Building.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents