Similar Projects
North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

Aggregate Pier Ground Improvements
Infrastructure
Sub-Bidding
Federal Way, WA

Water Main Relocation and Early Grading
Infrastructure
Results
Bellingham, WA

VA American Lake Phase 2 Site Development
Demolition, Term Contract, Infrastructure, Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Tacoma, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Post-Bid
$705,000 to $790,000 est. value
Eatonville, WA 98328

Doris Morrison Learning Center Building Site and Trail
New Construction, Infrastructure
Post-Bid
WA

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Orchards Parcel Site Development
Alteration
Pending Verification
$1,000,000 est. value
Vancouver, WA 98682

Sprague Union District Cso-34 Tank Above Ground Development
Infrastructure
Bidding
Less than $300,000 est. value
Spokane, WA 99202

Reported 11/04/2021 12:00 AM
Project Title

Tower Site Readiness Phase II Project

Physical Address View project details and contacts
City, State (County) Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208 (Island, Kitsap, Snohomish Counties)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This “Site Readiness Project” involves 20 sites and at least two phases, due to permitting process and other time-sensitive preparations needed. Many of these sites require electrical, mechanical and structural upgrades in advance of a major upgrade to Sno911’s existing radio network. Most sites are located in Snohomish County. However, there is one site in each of the following counties: King, Island, Kitsap, and Skagit. The second phase of this work to provide construction services for electrical, mechanical, and structural work at eight SNO911 critical communications sites: North Campus, Camano, Fire Trail, 76th Street, Apple Cove, Marysville Tank, Mountlake Terrace, and Gold Hill. Subsequent phases of the work are forthcoming and will be bid separately from Phase I and II sites.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents