Similar Projects
John R. Pierce School
Addition
Conception
Brookline, MA 02446

Lynch Elementary School Renovation
Renovation
Design
$75,000,000 est. value
Winchester, MA

Florence Roche Elementary School Construction
New Construction - 109,855 SF
Design
$61,500,000 est. value
Groton, MA 01450

Lowell Elementary School - General Bids
Renovation, Addition - 94,100 SF
Bidding
$36,000,000 est. value
Watertown, MA 02472

Cambridgeport Elementary School Accelerated Repair Program Window Replacement
Renovation
Bidding
Cambridge, MA 02139

Lowell Elementary School - Filed Sub Bids
Renovation, Addition - 94,100 SF
Sub-Bidding
$36,000,000 est. value
Watertown, MA 02472

East Gloucester / Veterans' Memorial School
New Construction - 91,500 SF
Sub-Bidding
$51,800,000 est. value
Gloucester, MA 01930

Florence Roche Elementary School
New Construction - 109,855 SF
Post-Bid
$61,500,000 est. value
Groton, MA 01450

Wareham Elementary School - General Bid
New Construction - 159,989 SF
Post-Bid
Less than $68,916,869 est. value
Wareham, MA 02571

Construction of the Pentucket Regional School Building Project
New Construction, Demolition - 358,700 SF
Results
$70,000,000 to $160,000,000 est. value
West Newbury, MA

New Elementary School
New Construction
Results
Acton, MA

New George H Mitchell Elementary School - General Bids
New Construction - 136,000 SF
Construction
$60,500,000 est. value
Bridgewater, MA 02324

Dexter Southfield School
Addition - 30,000 SF
Construction
$7,777,613 est. value
Brookline, MA 02445

Bowe School Ventilation Repairs
Pending Verification
$300,000 est. value
Chicopee, MA 01013

Sela International School - Interior Modifications
Renovation
Pending Verification
Hingham, MA 02043

Last Updated 10/27/2021 09:13 AM
Project Title

Fisher Hill Elementary School - General Bids

Physical Address View project details and contacts
City, State (County) Orange, MA 01364   (Franklin County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Commenced July 2021, Construction Completion Expected December 2023
Bids Due View project details and contacts
Estimated Value $40,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The total project scope consists of Construction of a New 3 Story Flat Slab Concrete and Steel Frame Addition to the Fisher Hill Elementary School. The site is re-configured to support the new complex and the existing Dexter Park School is to be demolished. An Early Site Enabling Package for utility re-location and the construction of a new access drive will be completed for the start of this project. Coordination with those elements of the site already constructed is expected.

Details

,, 96,000 SF - Elementary School, 45,000 SF Addition, 51,000 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents