Similar Projects
Electrical Rehabilitation, Repair, and Renovation
Term Contract
Bidding
Pittsburgh, PA

Herron Hill Reservoir Improvements: Sodium Hypochlorite Building - Electrical Construction
Alteration
Bidding
$207,941 est. value
Pittsburgh, PA

Fiber Internet Services
Post-Bid
Pittsburgh, PA 15123

Early Site Access at Pittsburgh International Airport - Electrical Construction
Post-Bid
Pittsburgh, PA 15231

New Security Entrances - Electrical Construction
Results
Pittsburgh, PA 15202

Capital Region Job Order Contracting Services
Term Contract
Results

Wastewater Treatment Plant Upgrade Phase 2 Project - Electrical Construction
Alteration
Bidding
$3,250,000 est. value
Clairton, PA

Phase 3 Interior Improvements at Parkway West Career - Electrical Construction
Post-Bid
Oakdale, PA 15071

Northeastern Region Job Order Contracting Services - Electrical
Term Contract
Results

Electrical Distribution System Upgrade
Alteration
Bidding
Pittsburgh, PA

Electrical Switchgear Replacement
Post-Bid
Pittsburgh, PA 15233

Replace Electrical Power Distribution System at Pittsburg Greenfield K-8 (Electrical Construction)
Results
Pittsburgh, PA 15007

Penthouse Addition for the Municipality of Mount Lebanon Firing Range Building - Electrical Construction
Alteration
Bidding
$7,000 est. value
Mount Lebanon, PA 15228

Cathedral of Learning Ground Floor Renovation - Electrical Construction
Post-Bid
$450,000 to $500,000 est. value
Pittsburgh, PA 1526

Mt. Washington Tunnel Electrical Systems Improvements
Results
Pittsburgh, PA 15222

Last Updated 06/18/2021 10:32 AM
Project Title

East Headworks - Electrical

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,698,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The East Headworks will provide preliminary treatment for a peak flow of 360 MGD. This contract is part of the overall wet weather plant expansion and will generally include the following: Modification of the Main Pumping Station to direct flows to the East and West Headworks facilities. 120-inch diameter conduit between the Main Pumping Station and the East Headworks. Six (6) mechanically cleaned bar racks and screenings conveying. Six (6) aerated grit tanks, grit pumping, concentrating and classifying equipment. Operations area that includes a control room, locker room, and break area. Removal of the West Headworks venturi flow meter. Replacement of the 120-inch diameter primary influent conduit. East, West and Center Primary Influent Conduits. Upgrade of the Headworks Odor Control System Modification of existing below grade pipe galleries. Various modifications to the existing West Headworks.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents