Last Updated 07/10/2019 05:45 AM
Project Title

I-26 Preservation (MM 60-75)

Physical Address View project details and contacts
City, State (County) (Laurens, Newberry Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 2.000 Ea Traffic Control 1.000 Ls Law Enforcement Officer 40.000 Hr Selected Clearing & Grubbing 0.300 Acre Selected Clearing 1.500 Acre Removal & Disposal Of Existing Pavement 45.000 Sy Borrow Excavation 6,546.000 Cy Flowable Fill 200.000 Cy Maintenance Stone 142.500 Ton Liquid Asphalt Binder Pg64-22 6,824.822 Ton Liquid Asphalt Binder Pg76-22 2,310.000 Ton Full Depth Asph. Pav. Patching 6" Unif. 11,700.000 Sy Full Depth Asph. Pav. Patching 8" Unif 2,550.000 Sy Milling Existing Asphalt Pavement 2.0" 81,678.000 Sy Milling Existing Asphalt Pavement 4.0" 532,928.000 Sy Milling Existing Asphalt Pavement (Variable) 2,500.000 Sy Milled-In Rumble Strip 60.560 Mi Hot Mix Asphalt Surface Course Type b 8,712.000 Ton Open-Graded Friction Course 35,530.000 Ton Warm Mix Asphalt Intermediate Course Type b - Special 117,244.000 Ton Pressure Grouting 1,075.000 Bag Permanent Construction Signs (Ground Mounted) 2,372.000 Sf Detour Signs 900.000 Sf Construction Zone Electric Changeable Message Sign (Trailer 2.000 Ea Pavement Markings(Temp-Thermoplastic) 6" White Broken Lines 46,303.000 Lf Pavement Marking(Temporary-Thermoplastic)-6"White Solid Line 186,884.000 Lf Pavement Markings(Temp-Thermoplastic)-6" Yellow Solid Lines 172,317.000 Lf Pavement Marking(Temporary-Thermoplastic)-8"White Solid Line 5,815.000 Lf Pavement Marking(Temporary-Thermoplastic)24"White Solid Line 275.000 Lf Pavememt Markings (Temp-Thermoplastic) 12” x 18” White Triangle Yield Bar 30.000 Lf Pavement Marking(Temporary-Thermoplastic)-White Single Arrow 5.000 Ea Pavement Markings(Temp-Thermoplastic)White Combination Arrws 4.000 Ea Pavement Markings(Temporary-Thermoplastic)-White Word `Only 3.000 Ea Temporary Clear Pavement Markers Mono-Dir.- 4"x4" 2,542.000 Ea Temporary Yellow Pavement Markers Bi-Dir.- 4"x4" 42.000 Ea 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 178,243.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 721,169.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 17,445.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 825.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 15.000 Ea White Word Message "Only"-Fast Dry Paint 9.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 12.000 Ea 6"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 674,107.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 46,091.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 187,096.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 5,815.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Thermo-125mil 30.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 275.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 5.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 3.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 4.000 Ea 6" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 172,317.000 Lf Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 42.000 Ea Perm.Red/Clear Pavement Markers Bi-Dir. - 4"x 4" 2,542.000 Ea Pref.Flex.Retro.Pvmt.Mark(t-1)Perm.(60mil)4"Wh.Solid 19,634.000 Lf Pref.Flex.Retro.Pvmt.Mark(t-1)Perm.(60mil)8"Wh.Solid 2,190.000 Lf Pref.Flex.Retro.Pvmt.Mark(t-1)Perm.(60mil)24"Wh.Sol 4,258.000 Lf Pref.Flex.Retro.Pvmt.Mark(t-1)Perm(60mil)Handicap Symbol 13.000 Ea Pref.Flex.Retro.Pvmt.Mark(t-1)Perm.(60mil)4"Blue.Solid 2,130.000 Lf Work Zone Its 1.000 Ls Bridge Approach Concrete Curb And Gutter(1`-10") 200.000 Lf Rip-Rap (Class b) 160.000 Ton Rip-Rap (Class c) 400.000 Ton Rip-Rap (Class d) 975.000 Ton Hand Placed Riprap 1,500.000 Ton Grouted Riprap 425.000 Sy Geotextile For Erosion Control Under Riprap(Class 1)Type b 500.000 Sy Geotextile For Erosion Control Under Riprap(Class 2)Type b 250.000 Sy Permanent Grassing For Non-Permitted Resurfacing Projects 20.970 Acre Silt Fence 4,000.000 Lf Replace/Repair Silt Fence 400.000 Lf Removal Of Silt Retained By Silt Fence 1,000.000 Lf
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents