Similar Projects
Valley Stream 30 Union Free School District Improvements
Renovation
Conception
$6,000,000 CJ est. value
Valley Stream, NY 11580

High School Library - 2022 Bond Proposition 3 - Wantagh Union Free School District
Renovation
Conception
$4,725,000 CJ est. value
Wantagh, NY 11793

Cafeteria Renovation - 2022 Bond - Sewanhaka Central High School District
Renovation
Design
$4,471,900 CJ est. value
Franklin Square, NY 11010

New Cosmetology Building - 2022 Bond - Sewanhaka Central High School District
New Construction, Infrastructure
Design
$3,459,491 CJ est. value
Floral Park, NY 11001

Library and Science Rooms Renovations at the North High School - PC-1, 2
Renovation
Bidding
$125,000 CJ est. value
Great Neck, NY 11023

Library and Science Rooms Renovations at the North High School - MC-1, 2
Renovation
Bidding
$450,000 CJ est. value
Great Neck, NY 11023

Capital Improvement Work at the South Middle School - Contract EC-1
Renovation
Sub-Bidding
$84,000 CJ est. value
Lake Success, NY 11020

Memorial JHS Kitchen, Servery, and Exterior Stairway
New Construction, Demolition
Post-Bid
$1,300,000 est. value
Valley Stream, NY 11580

2021-2022 Capital Improvement Program
Renovation
Post-Bid
$100,000 CJ est. value
North New Hyde Park, NY 11040

Great Neck U.F.S.D. Interior at Phipps
Alteration
Results
$250,000 est. value
Great Neck, NY 11020

Partial Roofing Replacement at Syosset High School
Alteration
Results
Syosset, NY 11791

Unit Ventilator Replacement - 2022 Bond Proposition 1 - Wantagh Union Free School District
Renovation
Pending Verification
$19,800,000 CJ est. value
Wantagh, NY 11793

Wantagh Middle School and High School Electrical Service - 2022 Bond Proposition 1 - Wantagh Union Free School District
Renovation
Pending Verification
$1,040,000 CJ est. value
Wantagh, NY 11793

Wantagh Middle and High School Bathrooms Renovation - 2022 Bond Proposition 3 - Wantagh Union Free School District
Renovation
Conception
$1,500,000 CJ est. value
Wantagh, NY 11793

Guidance Suite - 2022 Bond - Sewanhaka Central High School District
New Construction, Infrastructure
Design
$673,499 CJ est. value
Floral Park, NY 11001

Last Updated 04/24/2023 07:24 PM
Project Title

Capital Improvement Work at the South Middle School - Contract GC-1

Physical Address View project details and contacts
City, State (County) Lake Success, NY 11020   (Nassau County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $430,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 24, 2023, all bids received were rejected and project will be rebid. No anticipated date determined yet. Art Room Renovations, Toilet Reconstruction Work and Ceiling and Lighting Replacements. Optionally, in lieu of digital copies, hard copies may be obtained directly from REV upon a deposit of One Hundred ($100.00) Dollars for each complete set. Checks for deposits shall be made payable to the GREAT NECK UNION FREE SCHOOL DISTRICT and may be uncertified. All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit for hard copies will be returned upon receipt of plans and specifications, in good condition, within thirty days after bid date, except for the lowest responsible bidder, whose check will be forfeited upon the award of the contract. The Contract will be awarded to the lowest responsible bidder or the bids will be rejected within 45 days of the date of opening. The School District reserves the discretionary right to waive any informalities, to accept or reject any alternatives, or to reject all bids and advertise for new bids if in its opinion the best interest of the School District will thereby be promoted. Bidder may not withdraw its bid until forty-five (45) days after the bid opening, except in accordance with General Municipal Law Section 103(11). The Method of Contractor Selection has not been determined at this time. *The Bid Date is "To Be Determined." A future addendum will set the bid date.*

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents