Similar Projects
Rock Island Silicon Plant Redevelopment
Demolition, New Construction, Infrastructure, Build-out
Conception
$20,000,000 CJ est. value
Rock Island, WA 98850

Rock Island Silicon Plant Redevelopment
Demolition, New Construction, Infrastructure, Build-out
Conception
$20,000,000 CJ est. value
Rock Island, WA 98850

Chief Joseph Dam Debris Boom
Infrastructure
Design
$5,000,000 CJ est. value
Bridgeport, WA 98813

New Fire Station - Beebe Fire Station
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Orondo, WA 98843

Transmission and Distribution Dock Crew
Infrastructure
Bidding
$570,000 CJ est. value
East Wenatchee, WA 98802

Dollar General #24148 / Bridgeport - Revised
New Construction, Infrastructure - 12,480 SF
Post-Bid
$1,500,000 CJ est. value
Bridgeport, WA 98813

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

US 2 et al, NCR Bridge Patching 21-23
New Construction, Infrastructure
Results
$2,000,000 to $2,500,000 est. value

Construction of Douglas County Fire District 4 Station 244 - Re-bid
New Construction, Infrastructure
Construction
$1,797,000 CJ est. value
Orondo, WA 98843

Chapacka East Subdivision
New Construction, Infrastructure
Pending Verification
$20,800,000 CJ est. value
East Wenatchee, WA 98802

Chapacka East Subdivision
New Construction, Infrastructure
Pending Verification
$20,800,000 CJ est. value
East Wenatchee, WA 98802

US 97A/Knapps Hill Tunnel - Illumination Upgrades
Infrastructure
Design
$2,071,000 CJ est. value
Touhey, WA 98830

Pangborn Memorial Airport Taxiway A Realignment
Infrastructure
Post-Bid
East Wenatchee, WA 98802

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Last Updated 02/27/2023 10:33 AM
Project Title

C. Kummer Ranch Bridge Replacement

Physical Address View project details and contacts
City, State (County) Waterville, WA 98858   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Board of County Commissioners of Douglas County are seeking Request for Qualifications/Proposals (RFQ/RFP) from consultants for the Whitehall and Alstown Bridge Painting Project. The consulting firm shall have expertise in Bridge Inspection, Bridge Maintenance Practices, Civil and Structural Engineering Design, and Construction Inspection. The consultant is expected to begin work immediately upon contract approval. Funding has been allocated through the Federal Highway Bridge Program, and local sources, and will be held to standards for federally funded projects and ADA and Civil Rights language for Douglas County, and Federal EEO requirements. The scope of work includes, but is not limited to, inspecting, evaluating, and the development of engineering, permitting, and construction documents for preventative maintenance on the Whitehall and Alstwon Bridges. Miscellaneous: Douglas County, in accordance with Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all submitters/bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Questions regarding the project, solicitation and selection process should be directed to Jessie King, PE at (509) 884-7173, jking@co.douglas.wa.us. A DBE goal of thirteen (13) percent Questions that arise during preparation ofthe proposal shall be handled through the project coordinator, Jessie King, email: jking@co.douglas.wa.us, Douglas County Transportation and Land Services, by 4:00 p.m. February 21, 2023. Project Start Date - April 2023 ; completion by December of2024

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents