Similar Projects
MnDOT Northfield Truck Station Campus - Electrical and Mechanical
Bidding
$4,674,000 est. value
Northfield, MN 55057

Fairfax Municipal Utilities 3750/5250 Kva Transformer
Post-Bid
Fairfax, MN 55332

Health and Human Services Building Generator Addition
Post-Bid
Red Wing, MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Sauk Rapids Rice HS Lighting Upgrades
Results
Sauk Rapids, MN 56379

Switchgear Maintenance at Retirement Building
Term Contract
Post-Bid
Less than $15,000 est. value
Saint Paul, MN 55103

059--Uninterrupted Power Supply (UPS) Service and Maintenance
Results
Minneapolis, MN

Energy Services
Post-Bid
Long Lake, MN

Replacement Emergency Generator for Kenny School and Olson School
Results
Minneapolis, MN 55419

DNR R4 Banning SP EV Charging Station
Post-Bid
Sandstone, MN

Sandy Lake Dam Network Conduit Installation
Results
Less than $25,000 est. value
McGregor, MN 55760

Three Generator Docking Stations
Post-Bid
Farmington, Hastings, West Saint Paul, MN 55024

Replace UPS and Electrical Distribution System - Subbid
Results
Less than $519,113 est. value
Saint Paul, MN 55155

Electrical Maintenance Services
Term Contract
Post-Bid
Minneapolis, Saint Paul, MN

Replace UPS and Electrical Distribution System - General Bid
Results
Less than $519,113 est. value
Saint Paul, MN 55155

Reported 02/06/2021 12:00 AM
Project Title

LED Conversion of the History Center of Olmsted County

Physical Address View project details and contacts
City, State (County) Rochester, MN 55902   (Olmsted County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install occupancy sensors and dimmers to control the exhibit lighting. Relight the exhibit galleries and display cases, installing a combination of LED fixtures to provide ambient light and LED track lighting to accent focal points. Replace fluorescent lamps in the research area and archive space with linear LED fixtures. Install retrofit LED lamps in the existing fixtures in the storage and workrooms. Adjust the drop ceiling as some of the lights require new fixtures. Either replace the drop ceiling, replace the tiles around the new fixtures, or cut the current tiles to fit the new fixtures. Existing lights are 2X4 – see drawing L3 – we will be installing new lights based on the L5 drawings. Touch up paint work and paint the conduits as needed to match the current building design. Touch up from the area of lights removed in the L4 drawing. Conduits installed

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents