Similar Projects
Beechurst and 1st St Intersection Improvements - City of Morgantown
Infrastructure
Conception
$350,000 CJ est. value
Morgantown, WV 26505

Beechurst and 1st St Intersection Improvements - City of Morgantown
Infrastructure
Conception
$350,000 CJ est. value
Morgantown, WV 26505

WV 7 OP Interchange (Auth AC Project) (Split Funded)
Infrastructure
Design
$20,000,000 CJ est. value
Osage, WV 26543

WV 7 OP Interchange (Auth AC Project) (Split Funded)
Infrastructure
Design
$20,000,000 CJ est. value
Osage, WV 26543

Artificial Turf Replacement - Wagener field at Monongalia County Ballpark
Infrastructure
Bidding
$200,000 CJ est. value
Granville, WV 26534

Sledding Hill Slope Grading and Tow Rope Installation
Infrastructure
Post-Bid
WV

Paving Parking Lots 28 and ST5
Infrastructure
Post-Bid
$115,070 CJ est. value
Morgantown, WV 26505

Georgia Street Extension Project
Infrastructure
Results
Westover, WV

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

GigaFactory
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Morgantown, WV 26505

Van Voorhis Rd (Go Bond 4)
Infrastructure
Design
$5,000,000 CJ est. value
Morgantown, WV 26508

Woodburn Playground Equipment and Surface Installation
Infrastructure
Post-Bid
$130,000 CJ est. value
Morgantown, WV 26505

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

TAP Grant - Sidewalk-Bike Trail - City of Morgantown
Infrastructure
Conception
$350,000 CJ est. value
Morgantown, WV 26505

Van Voorhis Rd
Infrastructure
Design
$8,500,000 CJ est. value
Morgantown, WV 26508

Last Updated 03/22/2023 07:37 AM
Project Title

Richard Snyder Mem Br

Physical Address View project details and contacts
City, State (County) Maidsville, WV 26541   (Monongalia County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : NHPP0007304D Type of Work : Repl Super As of March 22, 2023, the project is in Final planning status. The funding obligation date for the construction is February 28, 2024. WVDOT - Richard Snyder Mem Br *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents