Similar Projects
Well 15 Replacement/ Replace Vertical Turbine Pump Assembly
Term Contract
Design
Indian Head, MD 20640

Maryland City Water Reclamation Facility (WRF) Utility Water Pump Replacement
Infrastructure
Bidding
$472,625 est. value
Laurel, MD 20724

Paleo Well 3 Construction Completion
Infrastructure
Bidding
$50,000 est. value
Baltimore, MD

H145--Repair Aurora Sump Pump and Motor
Term Contract
Post-Bid
Baltimore, MD 21201

Replace Booster Pump
Alteration
Post-Bid
$25,000 to $100,000 est. value
Beltsville, MD 20705

Pump, Motor and Mechanical Equipment Maintenance Services
Term Contract
Results
Bel Air, MD 21014

Fill In and Cap Hand Dug Wells, Newtowne Neck State Park, St. Mary`S County, MD
Results
Less than $50,000 est. value
Leonardtown, MD 20650

Residential Well Drilling At Clagett Farms
Demolition
Post-Bid
Annapolis, MD 21403

Benjamin Banneker Elementary School Well Pump Replacement
Results
Less than $22,000 est. value
Loveville, MD 20656

Wet Well and Manhole Rehabilitation
Infrastructure
Post-Bid
Poolesville, MD

Plater Street BPS Third Pump Installation
Results
$100,000 est. value
Aberdeen, MD 21001

Whitemarsh Park Irrigation Well
Infrastructure
Post-Bid
Centreville, MD 21617

Rehabilitation of 2 Water Production wells
Results
Fruitland, MD

Pump Maintenance Repair and Installation Services
Term Contract, Infrastructure
Post-Bid
Less than $100,000 est. value
Baltimore, MD

Well Abandonment
Results
Frederick, MD

Last Updated 06/08/2022 12:07 AM
Project Title

Phase 7 Well Construction

Physical Address View project details and contacts
City, State (County) Annapolis, MD 21409   (Anne Arundel County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes the following major items: Unit bid prices for the reconstruction, redevelopment, redrilling, testing and the installation of new pumps, motors and appurtenances in certain high-capacity production wells owned and operated by the Anne Arundel County Department of Public Works.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents