Similar Projects
UNR - Replace Auxiliary Rooftop Cooling Unit 2 at Mack Social Science
Alteration
Bidding
$60,000 to $120,000 est. value
Reno, NV

CSN West Charleston Building G Fume Hood Installation
Alteration
Bidding
$100,000 est. value
Las Vegas, NV 89146

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

SWRF Activated Carbon Media Replacement
Term Contract
Bidding
Henderson, NV 89074

Fume Hood
Post-Bid
Las Vegas, NV

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

45--Supply and Replace HVAC Units
Results
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

NV Ang Building 9 Chiller Replacement
Post-Bid
Reno, NV 89502

Welding Lab Vent - West Wendover High School
Results
West Wendover, NV 89883

Tonopah Field Office HVAC Replacement - BMDO
Term Contract
Post-Bid
Tonopah, NV 89049

Welding Lab Vent - Elko High School
Results
Elko, NV 89801

Last Updated 10/01/2021 11:51 AM
Project Title

Court House Cooling Towers Replacement

Physical Address View project details and contacts
City, State (County) Carson City, NV 89701   (Carson City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Carson City is accepting sealed bids for all labor, materials, tools and equipment necessary for the Carson City Court House Cooling Towers Replacement. The project consists of replacing two cooling towers located at the Carson City Court House located at 885 East Musser Street. The cooling towers will be capable of 960 gpm with a water temperature entering of 90 degree Fahrenheit and a water temperature leaving of 80 degrees Fahrenheit, incorporate a dry chemical water treatment feed system, a filter system, a two cell unit, and the fans will have variable speed drives.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents