Similar Projects
North Florida Mega Industrial Park - Master Plan
New Construction - 8,100,000 SF
Conception
$10,000,000 CJ est. value
Lake City, FL

Freedom Crossing - Master Plan
New Construction - 534,000 SF
Conception
Ocala, FL

Palm Pike Crossing - Master Plan
New Construction - 74,553 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Palm City, FL 34990

County Road 769 Commercial Building
New Construction - 7,500 SF
Design
Lake Suzy, FL 34269

O'Reilly Auto Parts (BG1)
New Construction - 6,800 SF
Post-Bid
$500,000 to $900,000 est. value
Belle Glade, FL 33430

Total Wine & More
Renovation - 28,115 SF
Post-Bid
Port Charlotte, FL 33948

Downtown Properties Redevelopment Project Phase One - Development
New Construction, Infrastructure
Results
Oakland Park, FL

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Miami River
New Construction - 3,678,706 SF
Construction
Less than $310,000,000 est. value
Miami, FL

Yo Wash Laundry
Renovation - 3,600 SF
Pending Verification
Lakeland, FL 33815

Medmen Facility Updates
New Construction, Addition - 18,100 SF
Pending Verification
Eustis, FL 32736

3115 Apalachee Parkway Development
New Construction, Demolition - 3,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Tallahassee, FL

Abbott Avenue Mixed-Use Development
New Construction, Build-Out, Demolition - 30,000 SF
Design
Miami Beach, FL 33141

Walmart Supercenter #718-603 - Capxhvac-1
Renovation
Post-Bid
Auburndale, FL

TopGolf
New Construction - 50,000 SF
Construction
$15,000,000 est. value
Fort Myers, FL 33911

Reported 06/23/2022 12:00 AM
Project Title

YSL

Physical Address View project details and contacts
City, State (County) State-Wide: FL
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, 1 Story Above Grade, 5,221 SF Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents