Similar Projects
Last Updated | 08/02/2022 01:01 PM |
Project Title | 24-Inch Maple Avenue Interceptor Phase II |
Physical Address | View project details and contacts |
City, State (County) | Alvarado, TX 76009 (Johnson County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,500,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Estimate: $2.2 - $2.5 Million The Project will include but is not limited to: 1. The installation of approximately 2,876 linear feet of 24" sanitary sewer, 12 linear feet of 12" sanitary sewer, by open cut, and 150 linear feet of 24" sanitary sewer by other than open cut. 2. The installation of 5 standard 5-foot diameter sewer manholes, 2 standard 5-foot drop manholes, and 1 standard 5-foot diameter polymer drop manhole. 3. The installation of 2,051 square yard asphalt pavement (as an alternate full depth or mill and overlay). A Pre-Bid Conference is not scheduled for this Project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |