Similar Projects
Reported | 07/26/2021 12:02 PM |
Project Title | Gravity Sewer Greenlawn Drive to Burnside 1 Pump Station Phase 2 (SS7258) CDBE |
Physical Address | View project details and contacts |
City, State (County) | Columbia, SC (Lexington County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Project Delayed |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Goal: 17% Construction of 1994 LF of 18-inch sewer; 42 LF of 16-inch sewer; 12 Each of manholes; 28 LF of bore and jack 30-inch casing and 6100 SY of resurfacing. The construction begins at the Cul-de sac at the south end of East Lake Trail and proceeds along East Lake Trail to the intersection of Fountain Lake Drive then proceeding northeast in fountain Lake drive for 188 feet then proceeding perpendicular to Fountain Lake Drive for 35 feet then parallel to Fountain Lake Drive for 57 feet then proceeding north along a creek for 42 feet then ending with connection to existing manhole. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |