Similar Projects
CCTV Inspection and Repair Project - Edgmont, Middletown and Rose Valley
Results
$870,000 to $970,000 est. value
Edgemont, Middletown, Rose Valley, PA

Holiday Park Sanitary Sewer Extension Project - Sewer and Force Main Construction
Results
$1,800,000 to $2,000,000 est. value
Harrisburg, PA 17111

2020 Sewer System Improvements
Results
$2,000,000 to $2,900,000 est. value
Harrisburg, PA 17101

Londonderry Estates Low Pressure Sewer Extension
Infrastructure
Results
$650,000 est. value
Middletown, PA

2020 Sewer Replacement
Results
Royalton, PA 17057

Wiconisco Creek Interceptor Improvements Project
Infrastructure
Bidding
Lykens, PA

Mary Alley Sewer Replacement Project
Results
$145,000 to $185,000 est. value
Highspire, PA 17034

Arsenal Boulevard Sewer Improvements - Phase 1
Results
$2,300,000 to $2,700,000 est. value
Harrisburg, PA 17103

Maintenance and Emergency Repairs to the Wastewater and Stormwater Collection Systems
Results
Harrisburg, PA 17109

Southeast Sewer Extension
Results
$2,800,000 to $3,000,000 est. value
Harrisburg, PA 17110

Highway Inlets Boxes, Grates, Frames Supplement 2
Results
Harrisburg, PA 17102

2020/2021 Lining Project
Term Contract
Results
Harrisburg, PA 17109

Maintenance and Emergency Repairs to Wastewater Collection System
Results
Harrisburg, PA 17110

2021 Sewer System Improvements Project
Infrastructure
Bidding
Harrisburg, PA

2020 Sewer Replacement and Rehabilitation Project CIPP Lining
Results
Royalton, PA 17057

Last Updated 07/01/2021 04:01 PM
Project Title

2021 Sanitary Sewer Improvements Project

Physical Address View project details and contacts
City, State (County) Harrisburg, PA   (Dauphin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of and includes all materials, equipment and labor necessary to furnish and install the work associated with the following Lots. 1. Lot 1 – Spring Creek 1 Trunk Replacement - 60 LF of 6-inch laterals, 750 LF of 8, 10 and 18-inch PVC and 300 LF of 14-inch DIP (epoxy lined) gravity sewer, pipe bursting 460 LF of existing pipe with 12-inch PE, 8 manholes and other miscellaneous work. 2. Lot 2 – Spring Creek Mini-Basin SC-2B Trunk Replacement - 10 LF of 8-inch PVC and 1,020 lineal feet of 12-inch PVC gravity sewer, 4 manholes and other miscellaneous work. 3. Lot 3 – Beaver Creek Meter Chamber - modifying an existing 9’ by 17’ concrete structure at grade by constructing concrete walls and a top slab to raise the elevation of the structure by approximately 4.7 feet, relocating the electrical components from their current location to within anew precast concrete building to be located on top of the new raised structure.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents