Similar Projects
Gregory Lane Complete Street/Drainage - Town of Jackson
Infrastructure
Conception
$1,650,000 est. value
Jackson, WY 83001

RFQ - Emergency Operations Center (EOC) Site Upgrades
Infrastructure
Conception
$350,000 CJ est. value
Jackson, WY 83001

Regrading and Resurfacing Project
Infrastructure
Design
$359,000 CJ est. value
Cheyenne, WY 82001

Irrigation System at the Pine Haven Area Cemetery
Infrastructure
Design
$380,000 CJ est. value
Pine Haven, WY 82721

Fubar Detention Dam Decommissioning
Infrastructure
Bidding
$5,000,000 CJ est. value
Cody, WY 82414

Project Manual for Fremont County Solid Waste Disposal District Scalehouse Construction
New Construction, Infrastructure
Bidding
$320,000 CJ est. value
Lander, WY 82520

Shell Falls Power Grid Installation
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Sheridan, WY 82801

Installation of Chain Link Fencing and Gates
Infrastructure
Sub-Bidding
$10,000 CJ est. value
Evanston, WY 82930

Tunnel #2 Cave-in Restoration
Alteration
Post-Bid
Torrington, WY

Owner`s Representative for the Horizontal Infrastructure and Site Planning and Development
Infrastructure
Post-Bid
Jackson, WY 83001

Casper - Alcova Irrigation District 102 Overflow Structure Rehabilitation
Alteration
Results
Casper, WY

District 3 Stockpiles
Infrastructure
Results

Dinosolar Solar Energy System
Infrastructure
Pending Verification
$266,617,340 CJ est. value
Casper, WY 82604

Mountain Acres
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Casper, WY 82601

Professional Architectural and Engineering Services for Level I Reconnaissance and Level II Feasibility Studies
Infrastructure
Conception
$2,000,000 CJ est. value
Cheyenne, WY 82002

Last Updated 08/05/2022 07:34 AM
Project Title

Horse Creek Box Culvert Installation Project

Physical Address View project details and contacts
City, State (County) Pinedale, WY 82941   (Sublette County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $130,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the removal of an existing timber bridge and the installation of a new double barrel concrete box culvert and miscellaneous appurtenances. CONTRACTORS shall be required to accompany each bid with a BID Bond with sufficient sure-ty, or a certified check, cashiers check or bank draft upon some reputable bank payable to Sublette County for at least ten (10) percent of the total amount of the BID. The bond, check or bank draft shall be forfeited as liquidated damages, if the CONTRACTOR, upon the letting of the contract to him, fails to enter into the contract within ten (10) days after it is presented to him for that purpose or fails to proceed with the performance of the contract. The BID Bond, draft or check shall be retained by Sublette County until proper bond to secure performance of the contract has been filed and approved. All the above is to be in accordance with 15-1-113 and 16-6-101 to 121, Wyoming Statutes, 2022. The right is reserved by Sublette County to reject any and all BIDS, and to waive any irregularity or informality in the BID process. BIDS may not be withdrawn for thirty days after the date of opening.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents