Similar Projects
Hawthorne Heights - Phase I
New Construction - 90,700 SF
Conception
Bentonville, AR 72712

Hawthorne Heights - Phase I
New Construction - 90,700 SF
Conception
Bentonville, AR 72712

Phat Tire Bike Shop And Mixed Use Development
New Construction - 14,828 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bella Vista, AR

ATHC
New Construction - 3,350 SF
Design
$1,000,000 est. value
Little Rock, AR 72204

Construction of the Senior Center in Mammoth Spring
New Construction, Infrastructure
Bidding
Mammoth Spring, AR

Rehab Fire Unit #40
Renovation
Post-Bid
Arkadelphia, AR 71923

Low-Rise Apartments
New Construction - 16,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Bella Vista, AR

Construction of the Fayetteville Parking Deck
Infrastructure
Results
Less than $1,250,000 est. value
Fayetteville, AR

Townhouse New Construction
New Construction
Results
Pine Bluff, AR

Tara Ridge
New Construction
Pending Verification
Bentonville, AR

Thrive Apartments
New Construction - 15,510 SF
Pending Verification
Fayetteville, AR 72703

Power & Ice Building
New Construction
Conception
Little Rock, AR

Porter Road Townhomes
New Construction
Design
Fayetteville, AR 72703

Enclosing Breezeways to Convert Into Utility Rooms in 51 Apartment Units
New Construction
Post-Bid
Osceola, AR

Huttig Community Center Project
Renovation
Results
Less than $61,000 est. value
Huttig, AR

Last Updated 12/16/2021 04:16 PM
Project Title

Trails at the Crossings

Physical Address View project details and contacts
City, State (County) Springdale, AR 72762   (Washington County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Parking Garage
Contracting Method
Project Status Building in Operation as of December 2021
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complex to include 1 and 2-bedroom units, storage spaces, fitness center, business center, putting greens, walking trails, planting areas, BBQ patio, volleyball, horse shoe pits, playgrounds

Details

17 Apartments/Condominiums, 3 Stories Above Grade, New Construction, 476 Unit(s), 60 Parking Garage, New Construction, 767 Parking Spaces, 1 Clubhouse/Social Club, 6,330 SF New Construction, 22.74 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Residential Equipment, Residential Appliances, Athletic and Recreational Equipment, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures, Playground Equipment.
Division 13 - Special Construction, Swimming Pools, On-Grade Swimming Pools, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents