Similar Projects
St. Lucie County Fire District Stations 10 & 15 Concrete & Drainage Rehabilitation
Bidding
Fort Pierce, FL 34953

Portofino Shores Lake Bank Restoration
Post-Bid
$484,650 to $530,510 est. value
Fort Pierce, FL

Ten Mile Creek Oxbow Restoration
Results
Fort Pierce, FL

Canal Maintenance
Results
Fort Pierce, FL 34945

Tilton Road Drainage Improvement Project
Results
Fort Pierce, FL 34945

Fort Pierce Inlet Artificial Reef Construction
Results
Fort Pierce, FL 34982

Summit Street at NSLRWCD Canal 8 Culvert Replacement
Results
$180,000 est. value
Fort Pierce, FL 34982

E-3 Canal Improvements - Phases 1 and 2 Construction Project
Results
Less than $5,200,000 est. value
Port Saint Lucie, FL 34984

McCarty Ranch Extension Water Quality Restoration Construction Project - Area 3
Results
Less than $2,000,000 est. value
Port Saint Lucie, FL 34984

Park and Ride Lots
Results
Less than $2,718,616 est. value
FL

Drainage Repairs and Improvements
Results
Less than $200,000 est. value

Emergency Dune Restoration and Miscellaneous Beach Services
Term Contract
Results
Fort Pierce, FL 34982

Emergency Debris Removal/Dike Repair
Results
Fort Pierce, FL 34982

Immokolee Road at FPFWCD Canal 5 Culvert Replacement
Results
$1,000,000 est. value
Fort Pierce, FL 34982

Construction of the Sagamore Storm Water Treatment Areas - East and West
Results
Less than $1,890,000 est. value
Port Saint Lucie, FL 34983

Last Updated 01/12/2021 04:26 PM
Project Title

Shore Protection Project, Beach Rennourishment 2021, Ft Pierce, St, Lucie County, Florida

Physical Address View project details and contacts
City, State (County) Fort Pierce, FL GROUP118   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF WORK: Project work consists of the base and one option. The work includes constructing a beach berm between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 to T-41 to an elevation +6.8 feet with a varying berm width. The Base of work consists of beach fill between Sta. 338+65 to Sta. 395+00 including an ADA compliant ramp. Option A consists of beach fill between Sta. 395+00 to Sta. 411+73. A permitted offshore borrow area for the project is located approximately 4 miles southeast of the project site. Due to the extensive hard ground areas located offshore of the fill template area, offshore pipeline access to the beach site is prohibited. The Contractor will operate the off-loading from inside the South Jetty of Fort Pierce Inlet, FL. Staging area and beach access to the project fill area is located at the end of Seaway Drive also near the south jetty offloading area. Project work also includes but is not limited to endangered species observers, sea turtle non-capture trawl sweeping, turbidity monitoring, beach tilling, and construction/vibration controls and monitoring.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents