Similar Projects
Multiple Award IDIQ General Construction Award-Presolicitation
Design
$5,000,000 to $10,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Design

Regional Skills Training Center - 2nd Floor UPFIT
Renovation - 15,277 SF
Bidding
Less than $210,000 est. value
Jacksonville, NC 28540

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

P1362 SOF Human Performance Training Facilities, Camp Lejeune, NC
New Construction - 20,500 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
Camp Lejeune, NC

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Y--Camp Geiger and Camp Johnson Pre-Engineered Buildings
- 8,350 SF
Results
$1,000,000 to $5,000,000 est. value
Jacksonville, NC

P1395 SOF Marine Raider Regiment HQ, MCAS, Camp Lejeune
New Construction - 30,000 SF
Construction
$10,000,000 to $25,000,000 est. value
Camp Lejeune, NC 28445

Onwasa Laboratory Addition
Addition - 4,000 SF
Construction
Less than $2,185,900 est. value
Jacksonville, NC 28540

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

P1483; ACV-AAV Maintenance Facility Upgrades
Post-Bid
$10,000,000 to $25,000,000 est. value
Jacksonville, NC

Reported 10/07/2020 12:00 AM
Project Title

Production Room Upgrade

Physical Address View project details and contacts
City, State (County) Jacksonville, NC 28540   (Onslow County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value Less than $150,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The current production room equipment is over 6 yrs. old and was designed with several single points of failure. The equipment in this room is essential for communicating to our citizens using Facebook live events, Board meetings and other essential communications. Multiple times over the last few months, the County has experienced issues in this room that required immediate and last-minute adjustments and message delivery downgrades because of equipment failure. To ensure quality, consistent communications during the Covid-19 response, the equipment must be upgraded in this room and introduce additional safeguards and backup systems. System will need to receive input from current cameras and mics (below) as well as NDX based equipment. Upgrading to a network-based system will allow for greater delivery of information to a much larger audience. This will allow potentially every county wide network connection to send and receive video and audio transmissions seamlessly with reliable transmission stability with up to 10 cameras and 15 Mics simultaneously to the public access channel G10, Facebook Live, possible streaming to cloud based digital services (YouTube, Roku etc.).

Details

Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents