Similar Projects
Last Updated | 07/24/2023 08:40 AM |
Project Title | Utah Ashley Central Canal Piping Project |
Physical Address | View project details and contacts |
City, State (County) | Vernal, UT 84078 (Uintah County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development, Water Lines |
Contracting Method | Bids by Invitation |
Project Status | Bidding, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $17,700,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project involves piping the Ashley Central Canal through the specified locations using HDPE pipes of various diameters, demolition of existing canal structures, excavation, fusion, backfilling, surface restoration, construction of concrete screening structures and inlet structures, installation of air valve assemblies, drains, valves, and other associated work. The project also includes approximately 40 turnouts along the pipeline. The Owner reserves the right to waive any informality or reject any or all proposals. PRE-QUALIFICATION INSTRUCTIONS: Interested contractors may obtain a packet explaining prequalification requirements beginning July 19, 2023 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |