Similar Projects
Reported | 08/14/2020 12:00 AM |
Project Title | Paint Booth Removal and Palletization |
Physical Address | View project details and contacts |
City, State (County) | Dover AFB, DE (Kent County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CLIN0001: Provide removal and palletization of an obsolete Col-Met enclosed paint booth in accordance with attached Performance Work Statement. The contractor must take the equipment apart in a manner that it could be reassembled at a later date. No items will be cut, bent or broken to facilitate removal of the mentioned equipment. The contractor will disconnect all electrical and gas connection directly connected to the paint booth. Lastly, all hardware, and small parts, removed will be collect, identified, and attached to the item from which it was removed. The contractor will provide material to affix removed equipment to a pallets, or pallets, to be turned in. The equipment must be banded to 48”x 96” pallet(s) and the pallet(s) must be designed to be forklifted onto a truck. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |