Similar Projects
Judicial Center - Water Intrusion Repairs
Post-Bid
$1,000,000 to $2,000,000 est. value
Harrisburg, PA 17120

Maintenance an Emergency Repairs to Water Distribution System
Post-Bid
Elizabethtown, PA 17022

Moore and Arch Street Water Line Replacement
Results
Less than $211,510 est. value
Elizabethville, PA 17023

Cameron Street Water Main Rehabilitation Project Phase 2
Results
$120,000 to $160,000 est. value
Harrisburg, PA 17101

Analysis Water Samples
Post-Bid
Harrisburg, PA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Spring Creek 1 Trunkline Replacement
Post-Bid
Harrisburg, PA

Callowhill and Vineyard Street Water Line Replacement
Results
Elizabethville, PA 17023

Water Distribution System Improvements
Post-Bid
Millersburg, PA

2020 Water System Improvements Project
Results
Harrisburg, PA 17101

Decorative Fountain Maintenance
Post-Bid
Harrisburg, PA

Swatara Creek Water Main Extension - Phase 3
Results
$850,000 to $1,000,000 est. value
Middletown, PA 17057

Capitol Complex East Wing Water Intrusion Repairs
Post-Bid
$3,000,000 est. value
Harrisburg, PA 17120

Center Street Water Line Replacement - Phase 2
Results
$150,000 est. value
Lykens, PA 17048

Rheems Water Main Replacement
Results
Elizabethtown, PA

Last Updated 05/04/2021 12:44 PM
Project Title

Cameron Street Water Main Improvements Project – Phase 3

Physical Address View project details and contacts
City, State (County) Harrisburg, PA 17101   (Dauphin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000 to $3,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of approximately 790 linear feet of 6-inch diameter, 40 linear feet of 8-inch diameter, 55 linear feet of 12-inch diameter, 75 linear feet of 16-inch diameter, and 3,270 linear feet of 20-inch diameter water main; replacement of approximately 31 water service connections, replacement of approximately 9 fire hydrant assemblies, surface restoration, and all other work identified in the Contract Documents. The Work is geographically located on South Cameron Street within the City of Harrisburg.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents