Similar Projects
Centennial Water Park Lift Station - WW2307 - City of Pearland
Renovation
Conception
$300,000 est. value
Pearland, TX 77584

Lift Stations 22 and 33 Expansion - WW2302 - City of Alvin
Renovation, Addition, Demolition
Conception
$1,027,000 est. value
Alvin, TX

Archeological Survey and Wetland Determination
New Construction
Bidding
$16,000,000 est. value
Coleman, TX

Northwest Booster Pump Station
New Construction
Bidding
$1,400,000 est. value
Saginaw, TX

Reconstruction of Royal Oaks Lift Station
Post-Bid
Pearland, TX

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Booster Pump Replacement
Results

Booster Pump Replacement
Results

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Lift Station 2 Rehabilitation - WW2104 - City of Alvin
Renovation
Conception
$325,000 est. value
Alvin, TX

Lift Station to Serve Harris County Municipal Utility District No. 506
New Construction
Bidding
$600,000 est. value
Houston, TX

Sewer Lift Station Pump Replacements at the Ambrosio Guillen Texas State Veterans Home
New Construction
Post-Bid
$100,000 est. value
El Paso, TX 79924

Newport Pointe Lift Station Phase 1
Results
TX

Heath Street Pump Station Improvements
Construction
$2,777,000 est. value
Rockwall, TX

Last Updated 06/28/2022 09:31 AM
Project Title

Lift Station No 1 Rehabilitation

Physical Address View project details and contacts
City, State (County) Trophy Club, TX   (Denton County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes rehabilitation of a 350 gpm pump station. The existing pumps and dry pit will be demolished and abandoned. New submersible pumps will be installed in the existing wetwell. The project will include construction of a new valve vault and reconstruction of the wetwell top. The project also includes site improvements, electrical improvements, and installation of a new standby generator. Temporary bypass pumping will be required to complete the project

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents