Similar Projects
Site Grading at 113 Leesburg Peak
Bidding
Greer, SC 29651

GLDTC 552 Crestwood Drive, GLDTC 557 Dacusville Highway and GLDTC 559 Sterling Community
Post-Bid
$1,500,000 to $2,500,000 est. value
Greenville, SC

GLDTC 567 - Rothwell Drive/ Millport Circle Relocation
Post-Bid
$500,000 to $1,000,000 est. value
Mauldin, SC 29662

Fairforest Way Rehabilitation Project - Phase 2
Results
Greenville, SC

Resurfacing/Reclamation CMRB of 19.04 Miles of Roads
Results
$3,000,000 to $5,000,000 est. value
Greenville, SC

SCTAC Durability Track
Post-Bid
Greenville, SC

Resurfacing/Reclamation CMRB of 28.21 Miles of Various Roads
Results
$6,000,000 to $9,000,000 est. value
Greenville, SC

Durability Track
Post-Bid
Greenville, SC

TOC - Site Work Contracting Services
Results

Construct a Trail Head and a Section of the Swamp Rabbit Trail along a .25 Easement
Post-Bid
Mauldin, SC 29662

Site Work, Grading and Paving for Accessible Areas at Kids Planet Playground
Results
Greer, SC 29651

Site Work, Grading and Paving for Kids Planet Playground
Results
Greer, SC 29651

GLDTC 556-Fountain Inn High School Road Improvements
Results
$2,000,000 to $3,000,000 est. value
Fountain Inn, SC 29644

Rehabilitation
Results
SC

GLDTC 560.01 MMRP FY 19-20
Results
$1,500,000 to $2,000,000 est. value
Greenville, SC 29601

Last Updated 12/07/2020 01:00 PM
Project Title

Fairmont Avenue Improvements

Physical Address View project details and contacts
City, State (County) Greenville, SC 29605   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of new 2,150 ft access road located at the Mauldin Road-W. Campus. Scope includes site clearing, grading, asphalt paving, fencing, stormwater controls, and related work to construct new access road for connection to Fairmont Avenue. The scope includes approximately 850 ft of widening and improvements to Fairmont Avenue.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents