Similar Projects
Z--Lowe Rehabilitate Central Street Walkway
Term Contract
Design
$500,000 to $1,000,000 est. value
Lowell, MA 01852

Driveway and Parking Lot Improvements, Green Street 689-Y
Infrastructure
Bidding
$40,000 est. value
Watertown, MA 02472

FY23 Specialized Sidewalk Improvements Contract
Term Contract
Bidding
$35,000 est. value
Cambridge, MA

Complete Streets Sidewalk Project, Great Road at Old Bolton Road and Harvard Road
Post-Bid
Less than $216,000 est. value
Stow, MA

Construction of Walkways With Lights
Post-Bid
Hudson, MA

Scheduled and Emergency Sidewalk and ADA Improvements and Related Work at Various Locations (Including Marthas Vineyard)
Results
Less than $670,000 est. value

Sidewalks, Driveway Aprons, Parking Lots
Results
$117,000 est. value
Acton, MA

FY23 Sidewalk Maintenance Contract
Infrastructure
Bidding
$540,000 est. value
Cambridge, MA

Concrete Sidewalk Reconstruction and ADA Ramps
Post-Bid
$200,000 est. value
Winchester, MA

Reconstruction Pearl Street Parking Lot
Results
Less than $351,000 est. value
Newton, MA 02458

Middlesex Community College Bedford Quad Patio Project
Infrastructure
Bidding
$205,997 est. value
Bedford, MA 01730

Downtown Hudson Riverwalk Construction
Post-Bid
$250,000 est. value
Hudson, MA

Asphalt Sidewalk Replacement
Results
$46,574 est. value
Winchester, MA 01890

Resurfacing of Various Streets and Appurtenant Work
Infrastructure
Bidding
$835,000 est. value
Marlborough, MA

Trolley Brook Trail from Memorial Drive to Megunko Road
Post-Bid
Ashland, MA

Reported 06/17/2022 12:00 AM
Project Title

Reconstruction of Various Streets Appurtenant Work

Physical Address View project details and contacts
City, State (County) Marlborough, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $895,000 [brand] Estimate
Plans Available from Municipal Agency - 06/02/22
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of utility improvements, roadway reconstruction including the replacement of hma berms/sidewalks and installation of cement concrete wheelchair ramps, including all labor, material and equipment necessary to complete the Work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents