Similar Projects
Last Updated | 10/09/2023 07:34 AM |
Project Title | RFP Construction Manager at Risk- Renovation and Modifications of Twin City Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Twin City, GA 30471 (Emanuel County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected February 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $280,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Twin City Elementary School Renovations & Modifications I. Introduction A. Purpose The Emanuel County Board of Education is considering the services of a Construction Professional with a preference for Construction Management at Risk Firm (CM/GC) for the project listed above to be referred to as (The Project). The CM/GC will assume responsibility for project construction cost by issuing a guaranteed maximum price not later than 90% through the design phase. The GMP will be a contractual obligation. CM/GC will also develop an overall project schedule, which will be a contractual obligation. In addition, CM/GC will be responsible for methods of construction, safety, and the scheduling and coordination of the work of all construction and miscellaneous contracts required for completion of the project within its predetermined budget and schedule. The CM/GC will be expected to work closely with the Architect, James W. Buckley & Associates (114 North Green Street; Swainsboro, GA 30401; Attn: Craig Buckley). B. Project Objectives The CM/GC will function as a CM-At-Risk (CM/GC). During Pre-Construction, the CM/GC will be responsible for pricing and value engineering issues, along with issues of the facilitys maintainability and constructability. When design documents for the project have been developed in sufficient detail (approximately 90% complete), the CM/GC, with the support and assistance of the Architect, will commit to a Guaranteed Maximum Price (GMP) for all construction and site development. The Owner reserves the right to request an alternative additive item for FF&E, which we may ask to be included in the GMP (The Owner will accept or reject this item prior to finalizing the GMP). Construction will commence with the release of distinct work packages while the total design documents are being finalized. Deadline for written questions and clarificationon Request for Qualifications 23October2023 5:00PM |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |