Similar Projects
I-49 North Inter-City Connector - LaDOTD
Infrastructure
Conception
$100,000,000 est. value
Shreveport, LA 71150

Police Facilities Maintenance and Improvements - City of Shreveport
New Construction, Renovation, Infrastructure
Design
$12,500,000 CJ est. value
Shreveport, LA 71107

Wallace Lake Road Office
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Shreveport, LA 71106

US 171: Caddo P/L - LA 3132
Infrastructure
Bidding
$10,000,000 CJ est. value
Keithville, LA 71047

US 171: Caddo P/L - LA 3132
Infrastructure
Bidding
$10,000,000 CJ est. value
Keithville, LA 71047

Interstate Sweeping in District 04
Infrastructure
Post-Bid
$50,000 to $100,000 est. value

Construction of Water Facilities Improvements, Bel-Di-Gil Consolidation - Phase II in Caddo
Infrastructure
Post-Bid
Blanchard, LA

LA 511 - Turn Lanes at Walker and Kennedy
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

On Demand Water and Sewer Repair Services
Infrastructure
Results
$2,000,000 est. value
Shreveport, LA

American Electric Power / Shreveport
New Construction, Infrastructure - 80,000 SF
Construction
$77,450,000 CJ est. value
Shreveport, LA 71119

Caliber Collision / Shreveport
New Construction, Infrastructure - 16,100 SF
Pending Verification
$3,654,700 CJ est. value
Shreveport, LA 71115

Caliber Collision / Shreveport
New Construction, Infrastructure - 16,100 SF
Pending Verification
$3,654,700 CJ est. value
Shreveport, LA 71115

Runway 14-32 Rehab and Taxiway G,P,H,R Construction (H14005) - City of Shreveport
Infrastructure
Design
$2,500,000 CJ est. value
Shreveport, LA 71109

Love's Travel Stop #854 / Blanchard
New Construction, Infrastructure - 14,344 SF
Bidding
$4,500,000 CJ est. value
Blanchard, LA 71009

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Last Updated 11/17/2022 10:03 AM
Project Title

General Cargo Dock Hardstands Project

Physical Address View project details and contacts
City, State (County) Shreveport, LA 71115   (Caddo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,398,583 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 12, 2022, this project has not yet been awarded. A timeline for award has not yet been established. STATE PROJECT NR: ENG.21.037 General Cargo Dock Hardstands Project LOCATED IN: CADDO PARISH TYPE OF CONSTRUCTION: CONCRETE PAVING, DRAINAGE, & RAIL CONTRACTING AGENCY: CADDO- BOSSIER PARISHES PORT COMMISSION 6000 DOUG ATTAWAY BLVD.SHREVEPORT, LOUISIANA 71115 ESTIMATED COST: $4,000,000 - $4,500,000 ENGINEER: CIVIL DESIGN GROUP, LLC Gary Clark (318-674-9616) 1125 HAWN AVENUE, SHREVEPORT, LOUISIANA 71107 Bids must be submitted on the forms provided by the Contracting Agency, must be prepared in accordance with Section 2 of the 2018 Edition of the Louisiana Department of Transportation and Development, Office of Multimodal Commerce, General Provisions and must include all the information required by the bid form. The Caddo-Bossier Parishes Port Commission (the "Port") seeks to ensure equity and maximize participation by socially and economically Disadvantaged Business Enterprises ("DBEs") on all Port projects. The contract will be awarded to the lowest responsible and responsive bidder without discrimination on the grounds of race, color, sex or national origin. Disadvantaged businesses will be afforded a full opportunity to submit bids. The award of a contract, if awarded, will be made to the lowest responsible and responsive bidder whose bid complies with all requirements prescribed within 45 calendar days after the bid opening. However, when the contract is to be financed by bonds which are required to be sold after receipts of bids, or when the contract is to be financed in whole or part by federal or other funds not available at the time bids are received, the time will not start until receipt of federal and/or state concurrence or concurrence of the other funding source. Award will be within 30 calendar days after the sale of bonds or receipt of concurrence in award from federal and/or state agency or other funding source. The successful bidder will be notified by letter mailed to the address shown in the bid that the bidder is awarded the contract. The award of a contract for projects financed either partially or entirely with State bonds will be contingent on approval by the State Bond Commission. On projects involving federal funds the award of contract will also be contingent upon concurrence by the appropriate federal agency. On projects involving state funds the award of contract will also be contingent upon concurrence by the appropriate state agency. The Port reserves the right to reject all bids in accordance with Louisiana law. Mr. Eric D. England, PPM Executive Director Caddo-Bossier Parishes Port Commission *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents