Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

2021 Road Improvements
Infrastructure
Post-Bid
Sand Creek, WI

2021 Road Paving
Infrastructure
Post-Bid
Sand Creek, WI 54757

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Durand - Eau Claire, Rock Creek Bridge, B-17-0226
Results
Durand, Eau Claire, WI 54736

Glenwood City - Colfax, STH 128 to STH 79, Glenwood City - Colfax, STH 25 to CTH D, Glenwood City - Colfax, STH 79 to STH 25
Results
Colfax, Glenwood City, WI 54013

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

1058th Avenue Paving & 970th Avenue Chip Sealing
Results
Wheeler, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Crestwood Acres Neighborhood Street Reconstruction
Results
Weston, WI

21st Street and Utility Improvements
Results
Menomonie, WI

Menomonie River Road Resurfacing
Results
Menomonie, WI

Road Improvements
Results
Colfax, WI

2021 Barbicon Avenue Road Rehabilitation
Infrastructure
Results
Weston, WI

Connorsville - Bloomer, Culvert C-17-0047
Infrastructure
Results
Bloomer, Connorsville, WI

Last Updated 03/14/2022 01:26 AM
Project Title

Durand - Menomonie, Red Cedar River to 490th Street

Physical Address View project details and contacts
City, State (County) WI   (Dunn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Dunn County; 7220-00- 78, WISC 2022 255; STH 25; 6.273 Miles; Excavation, Base, HMA Pavement, Asphaltic Surface, Curb and Gutter, Beam Guard, Pavement Marking, and Culvert Replacements. Excavation Common, 2,206 CY; Base Aggregate Dense, 7,100 Ton; Marking Epoxy, 52,533 LF; Construction Staking, 37,091 LF; Construction Staking, 4 Each; Construction Staking, 1 LS; Culvert Pipe, 30 LF 18”, 96 LF 18”, 136 LF 30”; Concrete Curb and Gutter, 321 LF; Beam Guard, 575 LF; Beam Guard Energy Absorbing Terminals, 4 Each; Asphaltic Surface, 440 Ton; HMA Pavement, 25,521 Ton; Removing Asphaltic Surface Milling, 127,400 SY; Tack Coat, 19,520 Gals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents