Similar Projects
Skunk Hollow Pond for Regional Downtown Area - STM 18 - City of Littleton
Infrastructure
Conception
$500,000 CJ est. value
Littleton, CO 80122

Boot Barn Office and Retail Reuse
Renovation - 86,600 SF
Conception
$8,000,000 CJ est. value
Greenwood Village, CO 80111

Raising Cane's - Hampden Crossing
New Construction
Design
Aurora, CO 80014

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

Eastpark 70 Building 7 / Aurora
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Aurora, CO 80011

RFP - Construction Consultant: Estimation, Project Management and Construction
Demolition, New Construction, Infrastructure
Bidding
Aurora, CO 80011

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

Goldsmith Gulch Final Phase Improvements - Huntington-Caley Open Space
New Construction, Infrastructure, Alteration
Post-Bid
Greenwood Village, CO 80111

Piney Creek Lift Station Upgrades
Renovation, Infrastructure
Results
$4,182,300 CJ est. value
Aurora, CO 80011

Utah Park - Sidewalk and Bridge Abutment Repairs
Renovation, Infrastructure
Results
$300,000 to $335,000 est. value
Aurora, CO 80012

Panda Express at Smoky Hill Crossing
New Construction - 2,381 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Aurora, CO 80016

Englewood Station Apartments
New Construction, Infrastructure
Construction
$83,000,000 CJ est. value
Englewood, CO 80110

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

McDonald's Restaurant @ Blackhawk Pointe
New Construction
Pending Verification
Aurora, CO 80014

Rangeview Gulch Detention - STM 02 - City of Littleton
Infrastructure
Conception
$700,000 CJ est. value
Littleton, CO 80120

Last Updated 04/13/2023 11:00 AM
Project Title

Popeyes at Citadel

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a drive-through restaurant. As of April 13, 2023, this project has been submitted to the city building department for permitting and is under review. A construction start date has not been disclosed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents