Similar Projects
New Bridge Tipton / Park Street over RR crossing
Infrastructure, Renovation
Conception
$6,098,880 CJ est. value
La Porte, IN 46350

Chessie Trail Phase II - City of La Porte
Infrastructure
Conception
$500,000 est. value
La Porte, IN

Love's Travel Stops and Country Stores / Coolspring Township (Michigan City)
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Long Beach, IN 46360

11th Street Central Mixed Use Development
New Construction, Infrastructure - 10,000 SF
Design
$80,000,000 CJ est. value
Michigan City, IN 46360

2023-1 Michiana Shores CCMG Project
Infrastructure, Renovation
Bidding
$1,500,000 CJ est. value
Michiana Shores, IN 46360

Westville Correctional Facility - Bid Event 01B: Bid Category 31-02: Building Demolition
New Construction, Infrastructure
Sub-Bidding
$375,000,000 CJ est. value
Westville, IN 46391

Westville Correctional Facility - Bid Event 02A: H3, H7 Core & Shell
New Construction, Infrastructure
Sub-Bidding
$375,000,000 CJ est. value
Westville, IN 46391

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Excavation and Construction of an Addition to the Existing Fire Station
Addition, Demolition, Infrastructure
Post-Bid
$3,400,000 CJ est. value
Hanna, IN 46340

Drinking Water Improvement
Infrastructure
Results
Kingsford Heights, IN

Asphalt Resurface - SR 212
Infrastructure
Results
$4,208,201 CJ est. value
Michigan City, IN 46360

Construction Inspection Services - Indiana Department of Transportation
Demolition, New Construction, Infrastructure
Construction
$7,135,009 CJ est. value
La Porte, IN 46350

Franciscan Health Michigan City Hospital Renovations
Demolition, Infrastructure, Renovation
Pending Verification
$20,000,000 CJ est. value
Michigan City, IN 46360

RFP Engineering - Construction Inspection Services
Infrastructure
Pending Verification
$5,400,000 CJ est. value
La Porte, IN 46350

SoLa Development
New Construction, Infrastructure
Conception
$240,000,000 CJ est. value
Michigan City, IN 46360

Last Updated 07/05/2023 12:23 PM
Project Title

Lincoln Ave Sewer Replacement

Physical Address View project details and contacts
City, State (County) Michigan City, IN 46360   (La Porte County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $765,677 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 05, 2023, project was awarded to Woodruff & Sons. and the awarded amount is $765,676.88.** The work for this Project comprises of removing and replacing existing 10 and 12 inch VCP sanitary pipe with new SDR26 PVC sanitary pipe, pavement demolition, manhole demolition and replacement along with replacement installation of residential sanitary laterals. Please contact Mr. Jeff Wright at 219-872-9407 for any questions regarding this process. Questions about the Contract Drawings should be directed to Mr. Jeff Wright tel. 219. 872-9407 email: jwright@haasllc.com

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents