Similar Projects
Contract for the Purchase of a Submersible Pump
Post-Bid
San Antonio, TX

Annual Contract for Wastewater Submersible Pump Unit Repair Services
Post-Bid
San Antonio, TX 78212

Saws Water Well Mitigation Program
Results
Less than $97,000 est. value
San Antonio, TX

Annual Contract for Maintenance and Servicing of Deep Injection Well Valves and Heads
Results
San Antonio, TX 78212

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Annual Contract for Hydromatic Parts and Service
Results
San Antonio, TX 78200

Annual Contract for Centrifugal Water Pump Preventative Maintenance and Repair Services
Term Contract
Post-Bid
San Antonio, TX

Annual Contract for TCEQ Injection Zone Report and Pressure Falloff Test/Data Analysis
Results
Less than $31,600 est. value
San Antonio, TX 78200

One-Time Purchase: Flowserve Bare Pump
Post-Bid
San Antonio, TX

Micron Pump Station Well Pump No. 4 - Micron Well Fit Out P2
Results
Less than $1,800,000 est. value
San Antonio, TX 78251

H2oaks Desalination Facility, Well Field Collection Pipeline Project
Results
Less than $3,589,963 est. value
San Antonio, TX 78212

Water Well Mitigation Program
Results
Less than $100,000 est. value
San Antonio, TX 78212

Saws Water Well Mitigation Program
Results
Less than $100,000 est. value
San Antonio, TX 78212

H2oaks Desalination Facility Well Site Development
Results
Less than $3,452,955 est. value
San Antonio, TX 78212

Purchase of 8"X 8" and 12" X 12" Enclosed Trailer Mounted Backup Pumps
Results
San Antonio, TX 78212

Last Updated 08/27/2020 02:31 PM
Project Title

KELL160158 - Replacement of Two Air Cooled Chillers Bldg 2058

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78231   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes a design - build project KELL160158 (TriRiGa 1079232) for building 2058 Lackland AFB - JBSA. The contractor is to provide services and expertise for the replacement of two air cooled chillers with high efficiency equipment, pumps, valves, actuators and piping. The contractor shall provide quality controls, tools, equipment, labor, materials, supplies, transportation and supervision to acomplish the work. Address all items and identify any elements that impact cost, functional/operational relationships, maintenance, energy and life cycle costs, utilities, environmental/historical issues, aesthetics and design standards, engineering systems, and other specific items. Validate/draft the 1391 and/or form the basis to adjust the programming document for both cost and scope.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents