Similar Projects
2022 Lift Station and Forcemain Improvements
Renovation, Infrastructure
Bidding
$300,000 est. value
Grand Meadow, MN

2022 Bagley Water and Wastewater Phase1 Improvements
Infrastructure
Bidding
$5,318,000 est. value
Bagley, MN

New Heights Elementary School, South Point Elementary School, Central Middle School - 2021 Improvements
Post-Bid
East Grand Forks, MN 56721

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

METRO D Line BRT
Results
MN

Meadowbrook Elementary School Parking Lot Improvements
Post-Bid
Golden Valley, MN 55422

Old Village Phase 5 And 6 Street, Drainage and Utility Improvements
Results
MN

Grading, Aggregate Base, Bituminous Surfacing, Concrete Curb and Gutter, Concrete Walks, Water Main, Sanitary Sewer, and Related Restoration
Post-Bid
MN

Sakatah Singing Hills State Trail Lime Valley Slope Failure
Results
Less than $356,970 est. value
Mankato, MN

South Junior High Site Reconfiguration
Post-Bid
$1,500,000 est. value
Saint Cloud, MN 56301

2021 Street Improvements
Results
$2,300,000 to $2,700,000 est. value
Lino Lakes, MN

2021 Parking Lot Improvements
Infrastructure
Post-Bid
Hugo, Saint Paul Park, Stillwater, Woodbury, MN 55082

2021 Street and Utility Improvement
Results
$3,700,000 est. value
Montgomery, MN

Storm Sewer Bypass Connection
Infrastructure
Post-Bid
Duluth, MN

Last Updated 05/13/2022 12:55 AM
Project Title

TAP Trail Improvements

Physical Address View project details and contacts
City, State (County) Worthington, MN   (Nobles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

500 CU YD Common Excavation 70 LIN FT Construct Storm Sewer Pipe 14,200 SQ FT 2.5” Bituminous Walk 3,600 SQ YD Turf Establishment

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents