Similar Projects
Storm Water Cover Replacement Project
Post-Bid
Snowmass, CO 81615

Yampa River Channel Restoration & Access Design
Post-Bid
Less than $50,000 est. value
Steamboat Springs, CO 80477

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Fountain Creek Channel Stabilization at Riverside Project
Results
$2,000,000 to $3,000,000 est. value
Colorado Springs, CO

6th Avenue Culvert Replacement
Post-Bid
Monte Vista, CO

Landfill Cell Project
Results
Less than $368,733 est. value
Grand Junction, CO 81503

Bear Creek Trail Reconstruction
Post-Bid
$100,000 to $250,000 est. value
Delta, CO 81416

Culvert Replacement Various Locations
Results
$1,000,000 to $5,000,000 est. value

Bridge Abutment Foundation Repair
Post-Bid
Lakewood, CO 80228

Stokes Gulch Culvert Replacement
Results
Less than $268,126 est. value
Steamboat Springs, CO 80487

EWP Phase 1D: County Road 442
Post-Bid
CO

3rd Street Improvements
Results
Silverthorne, CO

2" Flexible Conduit
Post-Bid
Fort Collins, CO 80521

Chatfield Corners Underdrain Overflow Pipeline
Results
Less than $44,890 est. value
Gypsum, CO 81637

Maintenance of Sediment Pond, Nottingham Road
Post-Bid
Avon, CO

Reported 10/14/2021 12:00 AM
Project Title

Pond 331 Recharge

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO 80112   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 09/27/21
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to, furnishing and installing all labor and materials for site preparation and building construction activities including: 1) clear and grub; 2) seeding and revegetation; 3) piping (3,160 linear feet of 24 RCP) including manholes and construction of inlet/outlet structures; 4) earthwork (43,000 CY) including excavation, dewatering, haul, placing, and compaction of materials as necessary to construct the recharge pond and fills as shown on plan set; and 5) erosion protection.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents