Similar Projects
Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Conception
$12,100,000 CJ est. value
Rogers, AR 72758

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Conception
$12,100,000 CJ est. value
Rogers, AR 72758

Bentonville Public Library Expansion
Addition, Renovation, Infrastructure - 65,055 SF
Design
$12,000,000 CJ est. value
Bentonville, AR 72712

Rogers Ped. Impts. (TAP-19) (S)
Infrastructure
Design
$500,000 CJ est. value
Rogers, AR 72756

Police Training Facility
New Construction, Infrastructure
Bidding
$1,650,000 CJ est. value
Bentonville, AR 72713

Wave Pool Addition to the Cabot Aquatic Park
Addition, Demolition, Infrastructure
Bidding
$400,000 CJ est. value
Cabot, AR 72023

Southern Hills Apartment Complex
New Construction, Infrastructure - 288,749 SF
Sub-Bidding
$50,000,000 CJ est. value
Jonesboro, AR 72401

Greene County Tech Softball and Baseball Complex
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Paragould, AR 72450

Construction of AWIN Tower Site Work Designs
Infrastructure
Post-Bid
Little Flock, AR

Repairs and Improvements to the Jacob Wolf House Historic Site
Infrastructure
Post-Bid
Norfork, AR 72658

New Walking / Biking Trail on the Campus of ASU-MTN
Results
Mountain Home, AR

Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades
Renovation
Results
Little Rock, AR 72206

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

Starbucks / Bentonville
New Construction, Infrastructure - 1,921 SF
Construction
$800,000 CJ est. value
Bentonville, AR 72712

Quapaw Subdivision - Master Plan
New Construction
Pending Verification
North Little Rock, AR

Last Updated 08/18/2022 08:01 PM
Project Title

Wastewater Treatment Facility Improvements

Physical Address View project details and contacts
City, State (County) Oak Grove, AR 72660   (Carroll County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract generally consists of the construction of a low-pressure pipe system including the installation of pumps, pressure line, lateral lines, modifications to the existing treatment facilities including the closure of the existing recirculating sand filter system, and the miscellaneous appurtenances thereto for a complete and functioning collection system. Bidders with questions concerning this project may contact Bob Sell, P.E. at Allgeier, Martin and Associates, Inc., 7231 E. 24th Street, Joplin, MO, 64804, 417-680-7200. Blue Eye R-V School District, in Blue Eye, Stone County, Missouri at the location shown on the drawings

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents