Similar Projects
Popp's Ferry Causeway Park Floating Dock
Infrastructure
Bidding
Biloxi, MS

Biloxi River Boat Launch Project
Infrastructure
Post-Bid
MS

Point Cadet Marina Improvements
Infrastructure
Bidding
Biloxi, MS

Schooner Pier Complex - Hurricanes Zeta & Ida Rehabilitation
Renovation, Infrastructure
Bidding
Biloxi, MS 39530

Repair Marina Piers
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Biloxi, MS

Small Craft Harbor Commercial Dock Zeta Repairs
Infrastructure
Bidding
Biloxi, MS

Bells Ferry Boardwalk Removal and Replacement Project
Post-Bid
Pass Christian, MS 39571

West Biloxi Boat Launch Project
Infrastructure
Post-Bid
MS

Small Craft Harbor Fuel Dock
Infrastructure
Post-Bid
Biloxi, MS

Boat Launch Construction
Infrastructure
Post-Bid
Gulfport, MS 39507

Installation of Wood Fillers in the Pass Christian Harbor
Results
$160,684 est. value
Pass Christian, MS

West Small Craft Harbor Fishing Pier Hurricane Zeta Repairs
Infrastructure
Results
$601,896 est. value
Pass Christian, MS

Hurricane Zeta Repairs East Small Craft Harbor
Infrastructure
Results
$530,288 est. value
Pass Christian, MS

Hiller Park Boat Launch Improvements
New Construction, Infrastructure
Bidding
$400,000 to $600,000 est. value
Biloxi, MS

Repair Marina Piers
Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Biloxi, MS 39530

Reported 04/06/2022 12:00 AM
Project Title

Pass Christian Hurricane Zeta Repairs - West Small Craft Harbor

Physical Address View project details and contacts
City, State (County) Pass Christian, MS   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project includes bid documents for the design and construction of the repairs to the West Small Craft Harbor. The work involves furnishing of materials, equipment, labor, and incidentals necessary to perform services including but not limited to: selective demolition and reconstruction of the Skiff Pier, Pier P-1, the Maintenance Pier, inclusive of water services and electrical where indicated; replace handrails and toe boards on the Skiff Pier Access Ramps; replace damaged or missing handrails along the top of the breakwaters. Several Alternate Bid items have been included to allow for the comparison of bid prices using wood timber materials verses a “flow-through” grating material for the replacement of the decking. These alternate bid prices are inclusive of the necessary supporting structures (i.e., stringers) and fastening hardware to accompany the installation of the different material types.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents