Last Updated 09/11/2020 01:06 PM
Project Title

Reconstruction/Rehabilitation - Oconee Co

Physical Address View project details and contacts
City, State (County) SC   (Oconee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Traffic Control 1.000 Ls Borrow Excavation 562.000 Cy Cement Modified Recycled Base (12" Unif)-curing Method B 39,508.000 Sy Portland Cement for Cement Modified Recycled Base Course 1,580.000 Ton Maintenance Stone 100.500 Ton Liquid Asphalt Binder Pg64-22 311.965 Ton Full Depth Asph. Pav. Patching 8" Unif 50.000 Sy Milling Existing Asphalt Pavement 2.0" 2,464.000 Sy Milling Existing Asphalt Pavement (Variable) 1,150.000 Sy Milled-in Rumble Strip 2.500 Mi Hot Mix Asphalt Surface Course Type B 2,309.840 Ton Hot Mix Asphalt Surface Course Type C 2,869.060 Ton Driveway Paving-surface Type C 437.000 Ton Permanent Construction Signs (Ground Mounted) 1,292.000 Sf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 620.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 66,198.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 400.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 705.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 2.000 Ea 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 139,152.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 210.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 29,773.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 200.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 300.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 1.000 Ea White Word Message "School" -thermoplastic - 125 Mil. 1.000 Ea 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 31,251.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 4.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 212.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 630.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 11,310.000 Lf Sawcut for Loop Detector 4,110.000 Lf F&i-13"X24"X18"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 9.000 Ea Furnish & Install Video Detection Camera W/ Hardware & Lead-in 4.000 Ea Remove & Dispose Semi-rigid Gr Device 150.000 Lf Premash Reset W-beam Strong Post System 900.000 Lf Premash Type T Tl3 Leading 50` 6.000 Ea Permanent Grassing for Non-permitted Resurfacing Projects 2.725 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents