Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Buildings B-27 - B-29 Renovations Camp Dodge, Johnston, Iowa
Demolition, Infrastructure, Renovation - 1,350 SF
Bidding
$1,196,601 CJ est. value
Johnston, IA 50131

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

Principal Park Master Plan - Phase 1 Improvements
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Post-Bid
$5,218,000 CJ est. value
Des Moines, IA 50309

Animal Control Facility Bid Package No. 2 - Grading, Utilities and Public Improvements (Streets)
Renovation, Infrastructure - 21,900 SF
Results
$870,000 est. value
Des Moines, IA 50317

Merle Hay Road and Johnston Drive Improvements
Infrastructure
Results
$6,516,034 est. value
Johnston, IA

Olive Garden / Des Moines
New Construction, Infrastructure - 6,489 SF
Construction
$2,500,000 CJ est. value
Des Moines, IA 50320

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Pending Verification
$5,250,000 CJ est. value
West Des Moines, IA 50265

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Last Updated 07/13/2023 09:05 AM
Project Title

Hamilton Drainage Area Improvements - E304PW99 SM133 - City Of Des Moines

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50309   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $26,470,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UPDATE : This project provides for improvements addressing structural and capacity deficiencies in the Hamilton Drainage area. These improvements will reduce the number of drainage problems in this area. Storm sewer improvements are recommended to replace a deteriorating wooden box storm sewer. A watershed study has been completed including recommendations for both conveyance and detention improvements. Project is included City of Des Moines FY 2022-2026 CIP Page 107 _______________________________________________________________________________________________ This project provides for improvements addressing structural and capacity deficiencies in the Hamilton Drainage area. These improvements will reduce the number of drainage problems in this area. Storm sewer improvements are recommended to replace a deteriorating wooden box storm sewer. A watershed study has been completed including recommendations for both conveyance and detention improvements. Project is included City of Des Moines FY 2021-2025 CIP Page 103 __________________________________________ This project provides for improvements addressing structural and capacity deficiencies in the Hamilton Drainage area. These improvements will reduce the number of drainage problems in this area. Storm sewer improvements are recommneded to replace a deteriorating wooden box storm sewer. A watershed study will be completed to update recommendations in the original 1984 study. Project is included City of Des Moines FY 2021-2026 CIP Page 172 ___________________________________________________________________________________________________________________________________________________________________________ This project provides for improvements addressing structural and capacity deficiencies in the Hamilton Drainage area. These improvements will reduce the number of drainage problems in this area. Storm sewer improvements are recommneded to replace a deteriorating wooden box storm sewer. A watershed study will be completed to update recommendations in the original 1984 study. Project is included City of Des Moines FY 2021-2026 CIP Page 172 ___________________________________________________________________________________________________________________________________________________________________________ This project provides for improvements addressing structural and capacity deficiencies in the Hamilton Drainage area. These improvements will reduce the number of drainage problems in this area. The next improvements, based on priorities identified in the Watershed Study, are located along Shawnee Avenue from 11th Street to 7th Street. Also included in later phases is storm sewer reconstruction from Shawnee Avenue and Columbia Street to Wright Street and Euclid Avenue to replace a deteriorating wooden box storm sewer. A watershed study will be completed to update recommendations in the original 1984 study. These improvements were recommended in the Hamilton Drain Storm Water Analysis. As of May 20 2019, this project is currently in the FY 2019-20/2024-25 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2020. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2020 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of July 13, 2023 no new information available

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents