Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Apollo Circle Resurfacing
Infrastructure
Post-Bid
SC

Rehabilitation - Barnwell County
Infrastructure
Results
SC

Preservation - District 7
Infrastructure
Results

Halford Street - Dirt to Pave
Infrastructure
Post-Bid
SC

Safety Improvements - District 7
Infrastructure
Results

Construction of Pickleball Courts
Infrastructure
Post-Bid
$750,000 CJ est. value
Barnwell, SC 29812

Reconstruction/Rehabilitation - Bamberg/Barnwell Co
Infrastructure
Results

RFP D/B - Edisto REC Research Infrastructure Upgrades and Expansion
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$5,250,000 CJ est. value
Blackville, SC 29817

Reconstruction/Rehabilitation
Infrastructure
Results

Williston Elko Schools 2022 Renovations
Renovation, Infrastructure
Results
$1,100,000 to $1,300,000 est. value
Williston, SC 29853

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Water Filtration and Transmission Improvements
Infrastructure
Results
$3,218,231 CJ est. value
Williston, SC 29853

Last Updated 01/30/2023 01:33 AM
Project Title

West Street to Springfield Road Water Line FY 2020

Physical Address View project details and contacts
City, State (County) Williston, SC 29853   (Barnwell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,730,089 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 2,485 linear feet of 10-inch water line, 3,163 linear feet of 8-inch water line, 456 linear feet of 6-inch water line, 170 linear feet of 16-inch steel casing, 180 linear feet of 12-inch steel casing, 460 square yards sidewalk and appurtenances. Time allotted for construction is 360 consecutive calendar days for substantial and final completion. Consideration will be given for issuing the Notice to Proceed based upon anticipated delivery of materials. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents