Similar Projects
2020 Water Main Replacement Project
Bidding
Belleville, NJ

Water Main Replacement at North Mountain Avenue Stonebridge Road
Post-Bid
Montclair, NJ

Water Main Improvements
Post-Bid
Caldwell, NJ

Church Street and Elm Drive Water Main Improvements
Results
$229,500 est. value
Cedar Grove, NJ 07009

2019 Utility Improvements
Results
Roseland, NJ

Project B Water Main Improvements
Post-Bid
Caldwell, NJ 07006

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Project C Water Main Improvements
Post-Bid
Caldwell, NJ 07006

Water Main Replacement at Clinton Road
Results
$374,132 est. value
West Caldwell, NJ 07006

Scotland Road Water Main Replacement and Decorative Lighting Project
Post-Bid
South Orange, NJ

Lead Service Lines Phase II
Results
Bloomfield, NJ 07003

Underground Facility Locating and Marking Services
Post-Bid
East Orange, NJ 07018

Furnish Water and Sewer Parts
Results
Livingston, NJ 07039

Water Main Replacement at Smull Avenue
Post-Bid
West Caldwell, NJ 07006

Valve Exercisng and Replacement Program - Phase 3
Results
Bloomfield, NJ 07003

Last Updated 02/03/2021 08:43 AM
Project Title

Lead Service Replacement Program - Contract 2

Physical Address View project details and contacts
City, State (County) Bloomfield, NJ   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes replacement of approximately twenty-five lead service and supply lines with copper lines within various locations of the Township of Bloomfield as specified herein and/or as directed by the Township Engineer during the course of the work. The work shall include excavation, replacement and full restoration of the disturbed areas. All lead materials shall be removed and disposed of by the contractor. Service pipe replaced from the curb stop to the meter shall be performed using pipe bursting or a similar method to limit disturbance and excavation within private properties. All private properties disturbed by this work shall be fully restored to pre-construction conditions.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents