Similar Projects
Turley-Manzanares Acequia Rehabilitation Project Phase 2
Post-Bid
NM

Pipes for an Irrigation Project
Infrastructure
Post-Bid
Shiprock, NM

Eva B Stokely Elementary Asphalt Parking Lot
Results
Shiprock, NM 87420

Villa View Drainage Improvements Phase 2
Results
Less than $368,000 est. value
Farmington, NM 87401

20th Street Project Phase III
Infrastructure
Post-Bid
$931,920 est. value
Farmington, NM

Design/Build Services for the Glade Run Recreation Area Trail Improvements Phase 2
Results
$500,000 est. value
Aztec, NM 84535

2021 Eledge Ditch Job
Infrastructure
Post-Bid
Flora Vista, NM

Newcomb High School Walking Path
Results
$223,459 est. value
Shiprock, NM

Ranchman Terrell Irrigation Ditch Improvements
Results
Less than $460,183 est. value
Flora Vista, NM 87415

Along the Waters Trail Construction Project
Results
$1,113,802 est. value
Farmington, NM 87401

New Bergin Substation Irrigation Bridge Crossing
Results
$175,000 est. value
Farmington, NM 87401

Recreation Center ADA Parking Lot Improvements Project
Results
Farmington, NM 87401

Ranchman Terrell In-Channel Irrigation Diversion Structure
Results
Less than $56,183 est. value
Aztec, NM 87410

Embarcadero Apartment Complex Drainage Improvements
Results
$463,543 est. value
Aztec, NM 87410

Animas Substation Retaining Wall and Grading Project
Results
Less than $624,000 est. value
Farmington, NM

Last Updated 10/06/2021 11:45 AM
Project Title

Ruins Road Repair

Physical Address View project details and contacts
City, State (County) Aztec, NM 87410   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Desires to repair the pavement, drainage piping, sidewalk and curb in the vicinity of a storm drain inlet on Ruins Road between Townsend Avenue and Kin Kaai Street. The City retained GEOMAT to perform site testing and the design for the repair of this roadway, sidewalk and curb.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents