Similar Projects
Flat Roof and Gutter System
Term Contract
Post-Bid
New Haven, MI 48048

2022 Roof Projects
Alteration
Post-Bid
Sterling Heights, MI 48313

City Hall Storage Barn Roof Replacement
Results
Richmond, MI 48062

2021 Roofing Projects
Results
Romeo, MI 48065

Transportation Building Roof - R
Alteration
Post-Bid
Romeo, MI

Asphalt Shingle Roof Replacement on Storage Building
Results
Clinton Township, MI 48038

Roosevelt Auditorium Roof Replacement
Alteration
Post-Bid
Richmond, MI

Jail Mechanical Penthouse and Freedom Hill Pavilion Roofing Projects
Results
Mount Clemens, Sterling Heights, MI 48312

2022 Roof Repair Program
Alteration
Post-Bid
$900,000 est. value
Saint Clair Shores, MI

Asphalt Roof Replacement and Gutters and Downspouts
Results
Washington, MI 48095

Roof Replacement Project - Washington Salt Storage Building
Results
Clinton Township, MI

Roof Repair – Shelby Service Center
Alteration
Results
Less than $10,000 est. value
Clinton Township, MI

Romeo Senior Center Roof
Alteration
Results
Romeo, MI 48065

Mount Clemens Middle School Roofing Replacement
Renovation, Alteration
Results
Mount Clemens, MI

Ice Arena Roof Replacement
Alteration
Results
Mount Clemens, MI

Last Updated 10/18/2022 02:03 PM
Project Title

Roofing and Sheet Metal Bid Package - 7B

Physical Address View project details and contacts
City, State (County) Center Line, MI 48015   (Macomb County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Construction Manager - 09/21/22
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed bids for the Center Line Public Schools, 2017 Bond Issue, Bid Package #7B, consisting of: Project 21-154 Center Line HS HVAC & Flooring Renovations Project 21-154 Wolfe Middle School HVAC & Flooring Renovations Bids submitted after this time and date will not be considered or accepted. Faxed and/or E-mail proposals will not be accepted. This Bid Package will consist of a sealed bid for the following Bid Division: 108: Carpentry / General Trades 109: Roofing / Sheetmetal 115: Metal Studs / Drywall / Acoustical Treatments 120: Painting 142: HVAC 143: Electrical All bids must include the Familial Disclosure Affidavit (Section 004205), the Iran Linked Business Affidavit (Section 004210), and the Criminal Background Check Affidavit (Section 004220). All Bids must be accompanied by a Bid Security, in either the form of a bid bond or certified bank check, in the amount of five (5) percent of the amount of the Bid, payable to Center Line Public Schools, as a guarantee that if the Bid is accepted, the School District is secured from loss or damage by reason of the withdrawal of the Bid or failure of the Bidder to enter a Contract for performance, Further, the Bidder will execute the Contract, provide the required insurance certificate(s) and file the required bonds within ten (10) days after notice of award of Contract but prior to Work commencing. If awarded a contract, the successful bidder may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the contract price. Center Line Public School District reserves the right to reject any or all bids received, to waive any informalities and irregularities in the bidding, and to accept a bid other than the lowest bid

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents