Similar Projects
Tom Corley Place/Townhome Subdivision
New Construction, Infrastructure
Conception
$12,825,000 CJ est. value
Lexington, SC 29072

US 378 Over Twelve Mile Creek
Demolition, New Construction, Infrastructure
Conception
$11,785,000 CJ est. value
Lexington, SC 29072

Batesburg-Leesville Boarding Facility
New Construction, Infrastructure - 4,000 SF
Design
$600,000 CJ est. value
Leesville, SC 29070

Lexington County Boardwalk
Infrastructure
Design
Leesville, SC 29070

Decatur Street Water Main Replacement
Infrastructure
Bidding
$1,500,000 CJ est. value
West Columbia, SC 29169

Decatur Street Water Main Replacement
Infrastructure
Bidding
$1,500,000 CJ est. value
West Columbia, SC 29169

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - Prequalification for Irmo High School East Wing Replacement
New Construction, Infrastructure - 126,000 SF
Post-Bid
$70,000,000 CJ est. value
Columbia, SC 29212

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Signal Upgrades - Lexington/Richland Co
Infrastructure
Results
$513,609 CJ est. value
Lexington, SC 29073

Murphy Express #8643 / Springdale
Demolition, New Construction, Infrastructure - 2,824 SF
Construction
$1,500,000 CJ est. value
Cayce, SC 29033

Chick-fil-A Supply Distribution Center - Saxe Gotha Industrial Park / West Columbia
New Construction, Infrastructure - 245,000 SF
Construction
$80,000,000 CJ est. value
West Columbia, SC 29172

University of South Carolina Health Sciences Campus
New Construction, Infrastructure - 292,000 SF
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Cardiac Catheterization Lab - Lexington Medical Center
Addition, Demolition, Infrastructure
Pending Verification
$2,902,219 CJ est. value
West Columbia, SC 29169

US 21 over Congaree Creek
Demolition, New Construction, Infrastructure
Conception
$6,750,000 CJ est. value
Cayce, SC 29033

Last Updated 10/18/2023 09:32 AM
Project Title

Watergate Wastewater System Improvements - Division "A"

Physical Address View project details and contacts
City, State (County) Lexington, SC 29072   (Lexington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bids are invited upon the several items and quantities of work as follows: Town of Lexington Bid Number 24-3, SCIIP GRANT NO. A-23-C120: Construction of sewer forcemain: 34-LF 4", 3,283-LF 6", 1,304-LF 8", 798-LF 10", 18,946-LF 12", and 5-LF 18". Force main installation via a combination of open cut, bore and jack, and horizontal directional drill. Project also includes air release valves, plug valves, fittings, connections, pavement repair, sediment and erosion control, landscape restoration, and all necessary appurtenances as specified and depicted in the Contract Documents. Reference is made to the information included in Sections 00815, 00818, and 00820. No bid shall be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law and has a classification of General Contractor-Public Utilities and a sub-classification of Water and Sewer Lines with the appropriate License Group Limitation for the Bid amount. This project is subject to the Town of Lexington's Local Vendor Preference Policy. No bidder may withdraw his Bid within 90 consecutive days after the actual date of opening. A certified check or bank draft payable to the order of the OWNER, negotiable U. S. Government Bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable Surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project as applicable. Any inquiry received before the close of business on Friday, October 6th , 2023 shall be given consideration. Every interpretation made to a Bidder will be in the form of an Addendum to the Contract Documents, and when issued, shall be on file with the office of the Owner and the office of the Engineer

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents