Similar Projects
Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

FIFTY Tower
New Construction, Infrastructure
Design
$450,000,000 CJ est. value
Atlanta, GA 30308

First United Methodist Church Mixed-use Development
Demolition, New Construction, Infrastructure, Build-out, Renovation
Design
$50,000,000 CJ est. value
Atlanta, GA 30308

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Physical Activity Center Expansion
Addition, Demolition, Renovation, Infrastructure - 4,987 SF
Post-Bid
$5,000,000 CJ est. value
Roswell, GA 30075

Contract For Replacement Of 2-Inch And 4-Inch Water Mains
Alteration
Post-Bid
East Point, GA

Stacks Road over CSX Railroad - Abutment Wall Repairs and Roadway Drainage Improvements
Results
College Park, GA 30349

T32-D7-PCC-District Wide-122083
Infrastructure
Results

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Medlock Shops / Johns Creek
New Construction, Infrastructure - 6,200 SF
Construction
$1,600,000 CJ est. value
Johns Creek, GA 30097

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

Riverside Drive Stormwater Mitigation Project
Infrastructure
Bidding
$558,237 CJ est. value
Sandy Springs, GA 30328

Last Updated 03/16/2023 03:33 AM
Project Title

Restoration of Disturbed Concrete - North and West Service Territory

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30327   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,158,934 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The due date for questions is extended from 2/24/23 to 3/6/23 at 5:00 p.m. Question Deadline February 24, 2023, 5:00 p.m. All Communications Regarding This Solicitation Must Be With the Assigned Procurement Agent,Edward S McAdoo III, purchasing@sandyspringsga.gov. This project includes an improvement of the intersection of Northside Dr and Old Powers Ferry Rd/Riverview Rd (TS106). This will include realigning the 4 legs of the intersection to accommodate a roundabout, stabilizing two (2) rock slopes with soil nail walls, restriping, paving, drainage improvements, and ADA improvements on the sidewalks and pedestrian crossings. The project is to be funded through the Sandy Springs TSPLOST funding.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents