Similar Projects
Kennedy Stadium - City of Bridgeport
New Construction, Infrastructure
Conception
$1,230,000 CJ est. value
Bridgeport, CT 06606

Perry Memorial Arch - City of Bridgeport
Infrastructure
Conception
$2,500,000 CJ est. value
Bridgeport, CT 06604

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

Railroad Avenue Multi Residential
New Construction, Infrastructure
Design
$7,400,000 CJ est. value
Greenwich, CT 06830

Eisenhower Park Pool and Pool House Reconstruction
New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
West Hartford, CT 06117

Darien Railroad Station Improvements
Infrastructure
Bidding
$30,000,000 CJ est. value
Darien, CT 06820

Site Upgrades at Elms Village, The Highlands, Rochambeau Apartments
Post-Bid
Hartford, CT 06108

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Hartford, CT 06103

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

141 Danbury Road Apartments
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Wilton, CT 06897

Enfield Street School and Henry Barnard School Parking Lot Improvements
Infrastructure
Construction
$570,180 CJ est. value
Enfield, CT 06082

Forest Commons Building
Demolition, New Construction, Infrastructure - 47,700 SF
Pending Verification
$59,000,000 CJ est. value
Fairfield, CT 06824

Norwalk Hospital Expansion and Renovation
Demolition, New Construction, Infrastructure, Renovation - 191,000 SF
Pending Verification
$224,000,000 CJ est. value
Norwalk, CT 06850

Jetland Street Parking Garage Addition/Expansion - City of Bridgeport
Addition, Demolition, Infrastructure
Conception
$1,500,000 CJ est. value
Bridgeport, CT 06605

Last Updated 09/14/2022 11:07 AM
Project Title

Underground Storage Tank Removal / Replacement Project

Physical Address View project details and contacts
City, State (County) Windham, CT 06280   (Windham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the Removal and Replacement of the 5,000 gallon Underground Storage Tank, and all associated work, at Windham Center Elementary School, 45 North Road, Windham Center, CT. Award of Contract shall be made to the lowest, responsible and qualified bidder. Bidders are directed to Section 5.3 of the Supplementary Instructions to Bidders regarding Consideration of Bids for this project. The Town of Windham reserves the right to reject any and all bids; to waive technical defects and to make such awards including accepting a bid, although not the low bid, as it deems in its sole discretion to be in the best interest of the Town. The Owner further reserves the right to accept or reject any part of any bid received; to present and negotiate terms of a contract together or separately with any party submitting a bid; to issue further requests for bids; to determine qualifications exclusively and finally; to request additional or refined bids from any person; to select any bid or part thereof based on any combination of factors, including the amount bid, the time of completion, and Owner's best interests. The Owner further reserves the right to retain all proposals submitted and to use any ideas in a bid regardless of whether that bid is selected. All bids must be accompanied by a 5% bid bond or Certified Check and the successful bidder is required to provide a 100% Performance Bond and Labor and Material Bond. No bidder may withdraw his bid for a period of ninety (90) days after the date of bid opening. The successful bidder must file a Performance Bond, Labor & Materials Bond and a Certificate of Insurance with the Finance Director within ten (10) days of notice of bid award. In accordance with Connecticut General Statute Sections 4a-100 and 4b-91, a responsible bid must contain two (2) documents: The Contractor Prequalification Certificate and the Update (Bid) Statement. The Town of Windham is an equal opportunity employer and requires an affirmative action policy for all of its Contractors and Vendors as a condition of doing business with the Town, as per Federal Executive Order 11246. This contract is subject to Prevailing Wage rates, State set-aside and contract compliance requirements. The contractor who is selected to perform this State project must comply with CONN. GEN. STAT.a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public Act 15-5. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services ("DAS") under the provisions of CONN. GEN. STAT. 4a-60g. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents