Similar Projects
Dehumidification Replacement
Alteration
Results
Idaho Falls, ID

HVAC System Replacement
Renovation, Alteration
Results
Potlatch, ID

Acoustic Mitigation Isolation, Phase 1
Renovation, Alteration
Post-Bid
$2,400,000 est. value
Moscow, ID

Center Chiller Replacement
Alteration
Results
$360,000 est. value
Boise, ID 83725

Gas Fired Boilers
Alteration
Results
Less than $200,000 est. value
Twin Falls, ID 83301

City Hall Annex - HVAC
Alteration
Bidding
Boise, ID 83702

Air Handling Unit Installation Project
Alteration
Post-Bid
Burley, ID

Magic Valley Regional Airport - Terminal Heat Pump Replacement
Alteration
Post-Bid
Twin Falls, ID 83301

Boise Airport Chiller Addition
Alteration
Results
Boise, ID 83705

Reported 12/10/2021 12:00 AM
Project Title

Replace Chiller, Data Room

Physical Address View project details and contacts
City, State (County) Boise, ID 83702   (Ada County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $179,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this project can be summarized to include replacing the existing 20-ton outdoor dry cooler, dual pump system, and indoor CRAC unit. The new 20-ton cooling system shall integrate into the existing Liebert control system. Work shall also include replacement of some perforated floor tiles to improve airflow and to update the control setpoints of the existing 30-ton cooling system to improve system performance

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents